• RU
  • icon Waiting For Moderation: 3
Menu

Temporary power supply to the shift village and asphalt plant LLC MIP of the Far East for the construction of the Amur federal highway 1838-1847 km - power supply

  • Added: 09.07.2014
  • Size: 305 KB
  • Downloads: 1
Find out how to download this material

Description

Power supply project for the temporary construction camp from the DPR feeder of the electrified railway.

Project's Content

icon
icon Проект.dwg

Additional information

Drawings content

icon Проект.dwg

Проект.dwg
up Up