Automated information and measurement system for commercial accounting of electricity and power
- Added: 01.07.2014
- Size: 651 KB
- Downloads: 0
Description
Project's Content
|
44_45_СО_Спецификация оборудования ПК1.cdw
|
1_23 Общие данные к проекту ПК_1 Авиаконструкторов, 1 к.1.docx
|
24_Э1_Структурная схема ПК1.cdw
|
25_26_Э3_Принципиальная однолинейная схема ПК1.cdw
|
27_28_C7 План размещения оборудования ПК1.cdw
|
29_30_31_32_33 Э0_Схема подключения оборудования ПК1.cdw
|
34_35 КЖ_Таблица соединений ПК1.cdw
|
36_37_38_39_40_41_42_43 ШУ_Внешний вид шкафа учета ПК_1.cdw
|
Additional information
Contents
List of drawings of the main set
List of attached documents
General Data
Structure diagram
Schematic diagram of single-line electrical hydraulic system
Schematic diagram of single-line electrical hydraulic system
GRF Equipment Layout Plan
GRF Equipment Layout Plan
Electrical schematic diagram of connection of three-phase meters of transformer connection
Electrical circuit diagram for connection of three-phase meters
Direct ON
Communication gateway electrical circuit diagram
Electrical circuit diagram for connection of single-phase meters
Connection Table (Cable Log)
External types of accounting cabinets
Equipment Specification
2. Existing on-site accounting.
At present, the electricity metering at the facility is organized according to the following consumer groups:
2.1 Accounting of electric power consumption by household appliances is carried out by single-phase electric power meters installed in introductory distribution boards on staircase floors or directly in apartments.
Electricity consumption by electrical appliances of legal entities is recorded by three-phase and single-phase meters located in the premises of legal entities.
2.2 Accounting of electric power consumption for technical purposes (elevator equipment) is carried out by three-phase electric energy meters installed in GRL.
2.3 Accounting of electricity consumption for the needs of public lighting is carried out by three-phase meters installed in GRF.
Existing meters can be included in the designed PAM AIIS if the conditions of Section 3 of TRP201110KS.PZ.
Installation Instructions
To mount counters of the electric power in a case it agrees with the scheme TRP201110KS1.ShU. To install cases of account and the equipment of communication in rooms of GRShch1 and GRShch2 according to the plan of placement of the equipment TRP201110KS1.S0.
Current transformers shall be installed in the cell of group connections:
- Transformers of current of GRShch1, Input 1, Input 2 to mount in the top section on combined tires, after FU1 and FU2 safety locks. The transformers shall be attached to the textolite site, which shall be installed on site. Current transformers shall be installed in three phases.
- Transformers of current of GRShch2 of Input 1, Input 2 to mount in the top section on combined tires, after FU1 and FU2 safety locks. The transformers shall be attached to the textolite site, which shall be installed on site. Current transformers shall be installed in three phases.
Voltage current measuring circuits shall be made with NYM 4x2.5 cable. Connect the cable wires to the busbars leaving the lead-in disconnectors in RG1, RG2 and the test terminal block in the metering cabinet according to the connection diagram TP201110KS1.E3
Current measuring circuits shall be made with NYM 4x2.5 cable. Connect the cable wires to the current transformers at the inputs of RG1, RG2 and the test terminal block in the metering cabinet according to the diagram TP201110KS1.E3.
44_45_СО_Спецификация оборудования ПК1.cdw
24_Э1_Структурная схема ПК1.cdw
25_26_Э3_Принципиальная однолинейная схема ПК1.cdw
27_28_C7 План размещения оборудования ПК1.cdw
29_30_31_32_33 Э0_Схема подключения оборудования ПК1.cdw
34_35 КЖ_Таблица соединений ПК1.cdw
36_37_38_39_40_41_42_43 ШУ_Внешний вид шкафа учета ПК_1.cdw
Similar materials
- 09.07.2014
- 25.01.2023
- 24.04.2021
- 03.07.2014
- 18.08.2016
- 17.12.2021