• RU
  • icon Waiting For Moderation: 11
Menu

Automated information and measurement system for commercial accounting of electricity and power

  • Added: 01.07.2014
  • Size: 651 KB
  • Downloads: 0
Find out how to download this material

Description

0.4kV distribution network of Lenenergo branch of Cable Network, etc. Aviakonstruktorov, 1, building 1 the System automated information and measuring commercial electricity and capacity metering of AIIS KUE "TPP Smart Metering" Start-up complex No. 1 Working drawings

Project's Content

icon
icon 44_45_СО_Спецификация оборудования ПК1.cdw
icon 1_23 Общие данные к проекту ПК_1 Авиаконструкторов, 1 к.1.docx
icon 24_Э1_Структурная схема ПК1.cdw
icon 25_26_Э3_Принципиальная однолинейная схема ПК1.cdw
icon 27_28_C7 План размещения оборудования ПК1.cdw
icon 29_30_31_32_33 Э0_Схема подключения оборудования ПК1.cdw
icon 34_35 КЖ_Таблица соединений ПК1.cdw
icon 36_37_38_39_40_41_42_43 ШУ_Внешний вид шкафа учета ПК_1.cdw

Additional information

Contents

List of drawings of the main set

List of attached documents

General Data

Structure diagram

Schematic diagram of single-line electrical hydraulic system

Schematic diagram of single-line electrical hydraulic system

GRF Equipment Layout Plan

GRF Equipment Layout Plan

Electrical schematic diagram of connection of three-phase meters of transformer connection

Electrical circuit diagram for connection of three-phase meters

Direct ON

Communication gateway electrical circuit diagram

Electrical circuit diagram for connection of single-phase meters

Connection Table (Cable Log)

External types of accounting cabinets

Equipment Specification

2. Existing on-site accounting.

At present, the electricity metering at the facility is organized according to the following consumer groups:

2.1 Accounting of electric power consumption by household appliances is carried out by single-phase electric power meters installed in introductory distribution boards on staircase floors or directly in apartments.

Electricity consumption by electrical appliances of legal entities is recorded by three-phase and single-phase meters located in the premises of legal entities.

2.2 Accounting of electric power consumption for technical purposes (elevator equipment) is carried out by three-phase electric energy meters installed in GRL.

2.3 Accounting of electricity consumption for the needs of public lighting is carried out by three-phase meters installed in GRF.

Existing meters can be included in the designed PAM AIIS if the conditions of Section 3 of TRP201110KS.PZ.

Installation Instructions

To mount counters of the electric power in a case it agrees with the scheme TRP201110KS1.ShU. To install cases of account and the equipment of communication in rooms of GRShch1 and GRShch2 according to the plan of placement of the equipment TRP201110KS1.S0.

Current transformers shall be installed in the cell of group connections:

- Transformers of current of GRShch1, Input 1, Input 2 to mount in the top section on combined tires, after FU1 and FU2 safety locks. The transformers shall be attached to the textolite site, which shall be installed on site. Current transformers shall be installed in three phases.

- Transformers of current of GRShch2 of Input 1, Input 2 to mount in the top section on combined tires, after FU1 and FU2 safety locks. The transformers shall be attached to the textolite site, which shall be installed on site. Current transformers shall be installed in three phases.

Voltage current measuring circuits shall be made with NYM 4x2.5 cable. Connect the cable wires to the busbars leaving the lead-in disconnectors in RG1, RG2 and the test terminal block in the metering cabinet according to the connection diagram TP201110KS1.E3

Current measuring circuits shall be made with NYM 4x2.5 cable. Connect the cable wires to the current transformers at the inputs of RG1, RG2 and the test terminal block in the metering cabinet according to the diagram TP201110KS1.E3.

Drawings content

icon 44_45_СО_Спецификация оборудования ПК1.cdw

44_45_СО_Спецификация оборудования ПК1.cdw

icon 24_Э1_Структурная схема ПК1.cdw

24_Э1_Структурная схема ПК1.cdw

icon 25_26_Э3_Принципиальная однолинейная схема ПК1.cdw

25_26_Э3_Принципиальная однолинейная схема ПК1.cdw

icon 27_28_C7 План размещения оборудования ПК1.cdw

27_28_C7 План размещения оборудования ПК1.cdw

icon 29_30_31_32_33 Э0_Схема подключения оборудования ПК1.cdw

29_30_31_32_33 Э0_Схема подключения оборудования ПК1.cdw

icon 34_35 КЖ_Таблица соединений ПК1.cdw

34_35 КЖ_Таблица соединений ПК1.cdw

icon 36_37_38_39_40_41_42_43 ШУ_Внешний вид шкафа учета ПК_1.cdw

36_37_38_39_40_41_42_43 ШУ_Внешний вид шкафа учета ПК_1.cdw

Free downloading for today

Update after: 10 hours 16 minutes
up Up