Technology of building erection
- Added: 22.01.2019
- Size: 2 MB
- Downloads: 0
Description
1. Initial data 1.1 Building plan: 2. 1.2 Number of floors: 3, floor height: 3.3 meters. 1.3 View of masonry of external walls: well. 1.4 Commencement of works: 1-July 1.5 Duration of works: according to schedule. 1.6 Exterior walls: 510 mm. 1.7 Inner walls: 250 mm, 1/4 brick partitions. 1.8 Number of working shifts per day: 1.
Project's Content
|
Поясняк.docx
|
Атабеков ТВЗ.dwg
|
Additional information
Contents
Contents
1. Initial data
2. Floor plan, external wall diagram, lintel layout
3. Specification of prefabricated structures
4. List of masonry volumes
5. Bill of Quantities
6. Material requirements
7. Calculation of labor costs and machine time
8.Technology of building erection
8.1.Selection of crane for building erection
8.2. Composition of masonry processes
8.3. Determination of the number of masons brigade
8.4. Selection of building erection method
8.5.Organising the bricklayer's workplace
8.6.Working Schedule
9.Operative Quality Control
10.Stonework safety
11. Material and technical resources
12. Technical and economic indicators: duration of work, labor costs of workers, production per 1 person per shift