• RU
  • icon Waiting For Moderation: 0
Menu

Technology of building erection

  • Added: 22.01.2019
  • Size: 2 MB
  • Downloads: 0
Find out how to download this material

Description

1. Initial data 1.1 Building plan: 2. 1.2 Number of floors: 3, floor height: 3.3 meters. 1.3 View of masonry of external walls: well. 1.4 Commencement of works: 1-July 1.5 Duration of works: according to schedule. 1.6 Exterior walls: 510 mm. 1.7 Inner walls: 250 mm, 1/4 brick partitions. 1.8 Number of working shifts per day: 1.

Project's Content

icon
icon Поясняк.docx
icon Атабеков ТВЗ.dwg

Additional information

Contents

Contents

1. Initial data

2. Floor plan, external wall diagram, lintel layout

3. Specification of prefabricated structures

4. List of masonry volumes

5. Bill of Quantities

6. Material requirements

7. Calculation of labor costs and machine time

8.Technology of building erection

8.1.Selection of crane for building erection

8.2. Composition of masonry processes

8.3. Determination of the number of masons brigade

8.4. Selection of building erection method

8.5.Organising the bricklayer's workplace

8.6.Working Schedule

9.Operative Quality Control

10.Stonework safety

11. Material and technical resources

12. Technical and economic indicators: duration of work, labor costs of workers, production per 1 person per shift

Drawings content

icon Атабеков ТВЗ.dwg

Атабеков ТВЗ.dwg

Free downloading for today

Update after: 13 hours 31 minutes
up Up