Multi-storey industrial building - erection technology
- Added: 03.07.2014
- Size: 285 KB
- Downloads: 0
Description
Project's Content
|
|
4ТК на монтаж-6.DOC
|
Введение.docx
|
Министерство образования и науки Республики Казахстан.docx
|
печать А1.dwg
|
Содержание.docx
|
Список использованной литературы.docx
|
Additional information
Contents
Introduction
1. Project Source Data
1.1 Characteristics of the installed building
2. Definition of scope and labour intensity of installation works
3. Selection of installation method
4 Selection of mounting and gripping devices
5 Determination of required operating parameters of cranes
6 Selection of optimal set of installation cranes by technical and economic indicators
7 Operational Capacity Determination
8 Definition of labour intensity and installation works
9 Determination of cost of installation works
11 Calculation of the required number of vehicles
12 Preparation of installation work schedule
13 Safety precautions
List of literature used
Introduction
The technology of construction production is the science of methods of performing construction processes during the construction of buildings and structures. At the same time, the concept of "method" includes the principles of performing construction processes based on various methods of influencing (physical, chemical, mechanical, etc.) for labor (construction materials, semi-finished products, structures, etc.) using labor tools (construction machines, small mechanization tools, installation equipment, various devices, equipment, devices, hand machines and tools, etc.).
The organization of construction production determines the essence and scientific foundations of pre-construction design and research, the relationship between the execution of construction processes in time and space, the material and technical support of construction, operational planning and production management.
Currently, domestic builders continue to develop the main ways to improve capital construction and increase the efficiency of capital investments. To this end, the main focus is on ensuring the timely commissioning of fixed assets and production capacities, concentrating funds and resources on critical construction sites, directing capital investments primarily for the technical re-equipment and reconstruction of existing enterprises and for the completion of previously begun construction projects, reducing construction time, improving design, and implementing construction on the most progressive and economical projects.