• RU
  • icon Waiting For Moderation: 1
Menu

Technical re-equipment of the boiler house of the production building

Description

The project provides gas supply to the existing independent built-in boiler house of the building. The boiler room provides installation of 2 automated water heating boilers Buderus Logano SK655 type 190.To take into account gas flow at the gas pipeline inlet to the boiler room, the SG-TK-D-65 gas meter is installed on the basis of the VK meter. Gas flow - 44 m ³/h For the safe operation of boilers at the gas pipeline inlet to the boiler room, the installation of the KTZ 001-100-02 thermal intake valve, the automatic gas content control system (CH4 + CO) with a shut-off solenoid valve is provided.

Project's Content

icon gazosnabzhenie-proizvodstvennogo-zdaniya-gsv.dwg
The material is a file that can be opened in program:
  • AutoCAD or DWG TrueView

Additional information

Drawings content

icon gazosnabzhenie-proizvodstvennogo-zdaniya-gsv.dwg

gazosnabzhenie-proizvodstvennogo-zdaniya-gsv.dwg
up Up