Preparation of a geological and technical work order for the technical re-equipment of the production well of the Buzovyazovskoye field by drilling a side shaft








- Added: 24.01.2023
- Size: 5 MB
- Downloads: 0
Description
Project's Content
![]() |
![]() |
![]() ![]() ![]() ![]() |
![]() |
![]() |
![]() |
![]() ![]() ![]() ![]() |
![]() ![]() ![]() ![]() |
![]() ![]() ![]() |
![]() ![]() |
![]() ![]() ![]() ![]() |
![]() |
![]() ![]() ![]() ![]() |
![]() |
![]() ![]() ![]() ![]() |
![]() ![]() ![]() ![]() |
![]() ![]() ![]() ![]() |
![]() |
![]() |
![]() |
![]() |
Additional information
ГТН.cdw

2.cdw

Схема обвязки устья спецификация.spw

ПЗ Бузовьязовское месторождение.docx
3.cdw

1.cdw

Схема обвязки устья.cdw

Цементировочная головка.cdw

Спецификация.spw

Similar materials
- 24.01.2023
- 20.11.2018
- 24.01.2023
- 24.01.2023