Preparation of a geological and technical work order for the construction of an operational obliquely directed well with a depth of 2280 m with the justification of the method and technology for opening the productive horizon of the Saratov field








- Added: 24.01.2023
- Size: 9 MB
- Downloads: 2
Description
Project's Content
![]() |
![]() |
![]() ![]() |
![]() |
![]() |
![]() ![]() ![]() ![]() |
![]() ![]() ![]() ![]() |
![]() |
![]() ![]() ![]() |
![]() |
![]() ![]() ![]() ![]() |
![]() |
![]() ![]() ![]() ![]() |
![]() ![]() ![]() ![]() |
![]() |
Additional information
Геолого-технический наряд.cdw

Схема расположения буровой установки.cdw

ПЗ Саратовское месторождение.docx
Устьевая головка.cdw

Головка колонная.cdw

Устьевая головка спецификация.spw