• RU
  • icon Waiting For Moderation: 0
Menu

Preparation of a geological and technical work order for the construction of an operational obliquely directed well with a depth of 2280 m with the justification of the method and technology for opening the productive horizon of the Saratov field

  • Added: 24.01.2023
  • Size: 9 MB
  • Downloads: 1
Find out how to download this material

Description

Preparation of a geological and technical work order for the construction of an operational obliquely directed well with a depth of 2280 m with the justification of the method and technology for opening the productive horizon of the Saratov field

Project's Content

icon
icon
icon ПЗ Саратовское месторождение.pdf
icon Схема расположения буровой установки.png
icon Устьевая головка спецификация(1).png
icon Геолого-технический наряд.cdw
icon Схема расположения буровой установки.cdw
icon Устьевая головка.png
icon ПЗ Саратовское месторождение.docx
icon Геолого-технический наряд.png
icon Устьевая головка.cdw
icon Головка колонная.png
icon Головка колонная.cdw
icon Устьевая головка спецификация.spw
icon Устьевая головка спецификация(2).png

Additional information

Drawings content

icon Геолого-технический наряд.cdw

Геолого-технический наряд.cdw

icon Схема расположения буровой установки.cdw

Схема расположения буровой установки.cdw

icon Устьевая головка.cdw

Устьевая головка.cdw

icon Головка колонная.cdw

Головка колонная.cdw

icon Устьевая головка спецификация.spw

Устьевая головка спецификация.spw

Free downloading for today

Update after: 9 hours 47 minutes
up Up