Description

Filling of the pool is carried out as follows: the cold water complying with the requirements of SanPiN 2.1.4.1074-01 is supplied from the existing potable water supply network (B1) to the overflow tank by opening the ball crane and visually monitoring the filling process. To maintain the water level in the overflow tank, a level sensor and a solenoid valve are provided that automatically adds water from the water supply.

Water is taken for recirculation from overflow tank by circulation pump with pre-filter. The water is then supplied to a filter unit (lighting filters filled with quartz sand), which ensures the retention of fine suspension, colloidal and organic contaminants.

Format - DWG compatible with AutoCAD 2004-2017, Compass, ZWCAD, nanoCAD, BricsCAD, etc.

Project's Content

icon Проект технологии плавательного бассейна_2007.dwg

Additional information

Drawings content

icon Проект технологии плавательного бассейна_2007.dwg

Проект технологии плавательного бассейна_2007.dwg
up Up