• RU
  • icon Waiting For Moderation: 11
Menu

Store cafe ventilation

  • Added: 14.08.2014
  • Size: 5 MB
  • Downloads: 0
Find out how to download this material

Description

In premises of shopping center "Azaliya" the supply and exhaust ventilation with mechanical and natural motivation by PV1-PV4, V5-V15, VE1-VE6 systems is designed.

Project's Content

icon
icon
icon 1этаж 30.06.05.dwg
icon 1этаж ната пслед-задание.dwg
icon 1этаж ната пслед.dwg
icon 1этаж ната стр.задание.dwg
icon 1этаж ната стр.задание1.dwg
icon 1этаж ната.dwg
icon Воздухообмены.dwg
icon Задание электрикам-25.06.05.doc
icon Записка ТЦ Азалия.doc
icon ПВ-1 (цоколь)-.pdf
icon ПВ-1 АЗА.pdf
icon ПВ-2(маг. 1этаж)-.pdf
icon ПВ-3(кафе 1 этаж).pdf
icon ПВ-3-.pdf
icon ПВ4(магазин 2 этаж)-.pdf
icon
icon ПВ-1 (цоколь)-.txt
icon ПВ-1 (цоколь).DVF
icon ПВ-2(маг. 1этаж)-.txt
icon ПВ-2(маг. 1этаж).DVF
icon ПВ-3(кафе 1 этаж).txt
icon ПВ4(магазин 2 этаж)-.txt
icon ПВ4(магазин 2 этаж).DVF
icon Спецификация АЗА -30.dwg
icon Спецификация АЗА -30Н.dwg
icon Спецификация АЗА -л1-9.dwg
icon Спецификация АЗА -л13-22.dwg
icon Спецификация АЗА -л23-25.dwg
icon Спецификация АЗА Новик.dwg
icon Спецификация АЗА.2.dwg

Additional information

Task THIS from CMF

Reconstruction incomplete construction of the building under

Azalea Trading House

1. Perform lighting of the ventilation chamber at the level of 7,620.

2. Automate supply systems PV1, PV2, PV3, PV4 - refer to Annex Sheet

Supply power to control modules of supply systems PV1, PV2, PV3, PV4, as well as to electric motors of exhaust systems.

Provide signal transmission to the duty panel from control modules of supply systems PV1, PV2, PV3, PV4:

- start-stop + general;

- indication "operation";

- insurance;

- indication of "accident" sound and light signals.

Duty desk on the basement (for systems PV1, B5, B6, B7, B8, B9) - in the operator room;

duty desk for systems serving 1.2 floors - in the lobby of the first floor.

5. Control ventilation systems from the installation site and remotely from control panels on the basement and first floors.

6. Air curtain control is local.

Smoke protection of the building

1. In case of fire, all plenum ventilation systems are disconnected by fire alarm signal.

2. Fire-retardant valves (with electromagnetic starter) installed on transit and prefabricated floor air ducts of general ventilation systems are automatically closed.

Ventilation and air conditioning

Design parameters of outdoor air are accepted as per SNiP 23-01-99:

-year cold period:

tn = -39° С, J = 38.1kj/kg (parameters B), wind speed 5.5 m/s;

- Warm period of the year:

tn = + 24.1 ° C, J = 51.5 kj/kg (parameters A),

tn = + 27.5 ° С, J = 54.4 kj/kg (parameters B),

wind speed-1 m/s;

- average temperature of the heating period -7.3 ° С;

- duration of heating period 227 days;

- barometric pressure 975 Ha.

The following documents were used:

SNiP 2.04.0591 * "Heating, ventilation and air conditioning"

SNiP 2.08.0289 * "Public Buildings and Structures"

SNiP 2.09.0487 * "Administrative and residential buildings"

Ventilation and air conditioning

In the premises of the shopping center "Azalea" designed supply

ventilation with mechanical and natural motivation by PV1PV4, V5-V15, VE1VE6 systems.

Ventilation systems are provided separate for groups of rooms for various purposes and for floors. Air exchanges are accepted by heat losses and multiplicities and are summarized in Table.

The project provides for ventilation equipment of companies

Systemair, CLIVET, ARCTIC.

In order to maintain optimal air parameters in summer, air cooling in central air conditioners of PV2PV4 systems is designed in rooms 1 and 2 floors. For the supermarket in the summer, an additional exhaust system B5 is provided. During the transition and summer periods it is necessary to open the air valves located in the upper tier of the second floor for natural ventilation and cooling at night.

Air distribution in the rooms is adopted according to the "top up" scheme through ceiling and wall type air distributors.

The air ducts of the systems are made of galvanized steel, according to GOST 1491880 *. The thickness of the air ducts within the ventilation chambers and the mains of the plenum systems is 1.0mm. Plenum ducts of ventilation systems are insulated by plates URSA P600, b = 20mm from glass fiber with cover layer of aluminum foil.

To reduce noise, all ventilation units are installed on the vibration base and are connected to the ducts with flexible inserts, the systems are equipped with noise absorbers, the ducts within the ventilation chambers are soundproofed.

The building is equipped with 12 air-heat curtains with electric heating.

Smoke protection of the building

In case of fire, all ventilation and air conditioning systems are disconnected by

fire alarm signal. Fire retardant valves with solenoid starters are automatically closed.

Transit air ducts of ventilation systems are made with coating with fire-retardant enamel SAE5BM, thickness 1.2mm.

Smoke removal is provided through air valves installed in the second tier of the second floor. The estimated time of filling the premises with smoke is longer than the time of evacuation of people in the premises. Residual combustion products are eliminated by common exhaust ventilation systems.

Drawings content

icon 1этаж 30.06.05.dwg

1этаж 30.06.05.dwg

icon 1этаж ната пслед-задание.dwg

1этаж ната пслед-задание.dwg

icon 1этаж ната пслед.dwg

1этаж ната пслед.dwg

icon 1этаж ната стр.задание.dwg

1этаж ната стр.задание.dwg

icon 1этаж ната стр.задание1.dwg

1этаж ната стр.задание1.dwg

icon 1этаж ната.dwg

1этаж ната.dwg

icon Воздухообмены.dwg

Воздухообмены.dwg

icon Спецификация АЗА -30.dwg

Спецификация АЗА -30.dwg

icon Спецификация АЗА -30Н.dwg

Спецификация АЗА -30Н.dwg

icon Спецификация АЗА -л1-9.dwg

Спецификация АЗА -л1-9.dwg

icon Спецификация АЗА -л13-22.dwg

Спецификация АЗА -л13-22.dwg

icon Спецификация АЗА -л23-25.dwg

Спецификация АЗА -л23-25.dwg

icon Спецификация АЗА Новик.dwg

Спецификация АЗА Новик.dwg

icon Спецификация АЗА.2.dwg

Спецификация АЗА.2.dwg

Free downloading for today

Update after: 10 hours 20 minutes
up Up