• RU
  • icon Waiting For Moderation: 0
Menu

Expanded Thermal Diagram T-100-130

  • Added: 21.01.2016
  • Size: 625 KB
  • Downloads: 3
Find out how to download this material

Description

Scientific Research University Volzhsky Branch of the Moscow Power Engineering Department of Heat and Power Engineering Course project in the discipline "Thermal Electric Stations" On the topic: "Thermal calculation of a power unit with a T-100-130 turbine Volgograd 2014 This project made thermal calculation of a power unit with a T-100-130 turbine. The graphic part shows the deployed thermal diagram of the power unit with the T-100-130 turbine. The course design contains 35 pages of explanatory note, 1 sheet A1 with expanded thermal diagram of the power unit with turbine T-100-130.

Project's Content

icon
icon т-100 разв.frw
icon Тепловой расчет Т-100-130.docx

Additional information

Introduction

The production of electric energy in Russia is carried out mainly by thermal electric stations - large industrial enterprises in which the disordered form of energy - heat - is converted into an ordered form - electric current. Thermal electric stations of thermal power plants, which use the thermal energy released during the combustion of organic fuel (coal, gas, oil, etc.), have become most widespread. The equipment of the power plant just serves to economically convert the chemical energy of the fuel into electric energy.

Those thermal power plants that, in addition to electricity, release heat in large quantities for the needs of industrial production, heating buildings, etc., are called thermal power plants (CHP). It is extremely profitable to generate heat at the CHP. That is why almost half of the electricity in Russia is generated at the CHP.

With a greater release of power generated by the flow of steam entering the heating plant, fuel is more efficiently used.

In the given work, the basic thermal diagram of the power unit with the heating turbine T100/120130 was calculated, the thermal and energy efficiency indicators were determined.

The main and auxiliary equipment of the power plant was selected.

Drawings content

icon т-100 разв.frw

т-100 разв.frw

Free downloading for today

Update after: 4 hours 59 minutes
up Up