• RU
  • icon Waiting For Moderation: 0
Menu

Drawings for the course project for sanitary equipment of buildings

  • Added: 06.06.2014
  • Size: 202 KB
  • Downloads: 1
Find out how to download this material

Description

2 drawings to the heading.

According to the task, a cold and hot water supply system, as well as an in-house and yard sewage system for a system of residential buildings, were calculated and designed. All houses are typical, 11-story, two-section. Each house is equipped with a technical floor 3 m high, in which there is a water metering unit, which consists of a water meter, a check valve and shut-off valves. Entry into the house is carried out on the side of the facade, pipes pass through specially designed casings in the foundation . On each floor there are 4 apartments. In each apartment, cold water and sewage are supplied to the washbasin, wash, shower mixer and flush tank. A towel dryer is installed on the hot water supply in the toilet. For hot water supply water is heated in CTP. The water consumption rate is 375 l/person * day. Depth of soil freezing is 1.4 m. For hot and cold water supply, metal plastic pipes are accepted, for sewage of the IPA pipe.

Project's Content

icon
icon СТОЗ Смирных.dwg

Additional information

Drawings content

icon СТОЗ Смирных.dwg

СТОЗ Смирных.dwg
up Up