• RU
  • icon Waiting For Moderation: 1
Menu

Reconstruction of low pressure gas pipeline using polyethylene pipes

Description

GENERAL INSTRUCTIONS. This working documentation was made on the basis of the client's letter of assignment and technical specifications No. 03/20 issued by the ___________ to solve the issue of reconstruction of the low-pressure gas pipeline with the transfer of the above-ground gas pipeline to the underground polyethylene gas pipeline on the street.

Project's Content

icon
icon 1252___1.dwg
The material is an archive with files that can be opened in programs:
  • AutoCAD or DWG TrueView
up Up