• RU
  • icon Waiting For Moderation: 1
Menu

Reconstruction of low pressure gas pipeline using polyethylene pipes

  • Added: 09.08.2014
  • Size: 185 KB
  • Downloads: 0

Description

GENERAL INSTRUCTIONS. This working documentation was made on the basis of the client's letter of assignment and technical specifications No. 03/20 issued by the ___________ to solve the issue of reconstruction of the low-pressure gas pipeline with the transfer of the above-ground gas pipeline to the underground polyethylene gas pipeline on the street.

Project's Content

icon
icon 1252___1.dwg
The material is an archive with files that can be opened in programs:
  • AutoCAD or DWG TrueView
up Up