Description
Water supply and sewerage - 25-storey residential building
Project's Content
![]() |
![]() |
![]() ![]() ![]() |
![]() ![]() ![]() ![]() |
![]() ![]() ![]() ![]() |
![]() ![]() ![]() ![]() |
![]() ![]() ![]() ![]() |
![]() ![]() ![]() ![]() |
![]() ![]() ![]() ![]() |
![]() ![]() ![]() ![]() |
![]() ![]() ![]() ![]() |
![]() ![]() ![]() ![]() |
![]() ![]() ![]() ![]() |
![]() ![]() ![]() ![]() |
![]() ![]() ![]() ![]() |
![]() ![]() ![]() ![]() |
![]() ![]() ![]() ![]() |
![]() ![]() ![]() ![]() |
![]() ![]() ![]() ![]() |
![]() ![]() ![]() ![]() |
![]() ![]() ![]() ![]() |
![]() ![]() ![]() ![]() |
![]() ![]() ![]() ![]() |
![]() ![]() ![]() ![]() |
![]() ![]() ![]() ![]() |
![]() ![]() ![]() ![]() |
![]() ![]() ![]() ![]() |
![]() ![]() ![]() ![]() |
![]() ![]() ![]() ![]() |
![]() ![]() ![]() ![]() |
![]() ![]() ![]() ![]() |
![]() ![]() ![]() ![]() |
![]() ![]() ![]() ![]() |
![]() ![]() ![]() ![]() |
![]() ![]() ![]() ![]() |
![]() ![]() ![]() ![]() |
![]() ![]() ![]() ![]() |
![]() ![]() ![]() ![]() |
![]() ![]() ![]() ![]() |
![]() ![]() ![]() ![]() |
![]() ![]() ![]() ![]() |
![]() ![]() ![]() ![]() |
![]() ![]() ![]() ![]() |
![]() ![]() ![]() ![]() |
![]() ![]() ![]() ![]() |
![]() ![]() ![]() ![]() |
![]() ![]() ![]() ![]() |
![]() ![]() ![]() ![]() |
![]() ![]() ![]() ![]() |
![]() ![]() ![]() ![]() |
![]() ![]() ![]() |
![]() ![]() ![]() |
![]() ![]() ![]() |
![]() ![]() ![]() |
Additional information
Source Data
According to SP 10.131302009 p. 4.1.7, the hydrostatic pressure in the separate fire water supply system at the elevation of the lowest located fire crane should not exceed 0.9 MPa.
When calculating the required head in the fire water supply system, the values of the geometric height of the rise, pressure loss at the water supply and free discharge from the fire crane in this case are constants.
Ng = 70.7 m;
Hvv = 2.0 m;
Bottom = 10.0 m;
Accordingly, in order to comply with the requirement of SP 10.131302009 p. 4.1.7, we can only operate with head losses along the length of pipelines (pipe diameters).
Let's calculate head losses by length:
The maximum water flow rate that can move along the fire-fighting riser in this case will be 5.2 l/s.
01_Общие данные.dwg
02,03_Схемы водоснабжение.dwg

04_Вода паркинг.dwg

05_Вода 1 этаж.dwg

06_Вода 2 этаж.dwg

07_Вода 3 этаж.dwg

08_Вода 4 этаж.dwg

09_Вода 5 этаж.dwg

10_Вода 6 этаж.dwg

11_Вода 7 этаж.dwg

12_Вода 8 этаж.dwg

13_Вода 9 этаж.dwg

14_Вода 10 этаж.dwg

15_Вода 11 этаж.dwg

16_Вода 12 этаж.dwg

17_Вода 13 этаж.dwg

18_Вода 14 этаж.dwg

19_Вода 15 этаж.dwg

20_Вода 16 этаж.dwg

21_Вода 17 этаж.dwg

22_Вода 18 этаж.dwg

23_Вода 19 этаж.dwg

24_Вода 20 этаж.dwg

25_Подкл. пож. техн..dwg

26_Квартирный ПК.dwg

27,28,29_Схемы канализация.dwg

30_Канализация паркинг.dwg

31_Канализация 1 этажа.dwg

32_Канализация 2 этаж.dwg

33_Канализация 3 этаж.dwg

34_Канализация 4 этаж.dwg

35_Канализация 5 этаж.dwg

36_Канализация 6 этаж.dwg

37_Канализация 7 этаж.dwg

38_Канализация 8 этаж.dwg

39_Канализация 9 этаж.dwg

40_Канализация 10 этаж.dwg

41_Канализация 11 этаж.dwg

42_Канализация 12 этаж.dwg

43_Канализация 13 этаж.dwg

44_Канализация 14 этаж.dwg

45_Канализация 15 этаж.dwg

46_Канализация 16 этаж.dwg

47_Канализация 17 этаж.dwg

48_Канализация 18 этаж.dwg

49_Канализация 19 этаж.dwg

50_Канализация 20 этаж.dwg

51_Канализация кровля.dwg

Similar materials
- 04.04.2016
- 18.04.2023
- 30.03.2023
- 12.04.2022
- 13.12.2023
- 10.05.2023