• RU
  • icon Waiting For Moderation: 0
Menu

Water supply and sanitation of a 5-storey residential building - internal water supply and sewerage of buildings

Description

Initial data (By task)

 

  1. The norm of living space - we accept 12 m2
  2. Number of floors – 5
  3. Floor height – 3.0 m
  4. The height of the basement is 2.7 m
  5. The absolute elevation of the 1st floor is 63.500 m
  6. The absolute elevation of the earth is 62.500 m
  7. The depth of the pipeline is 1.7 m
  8. Free head in the street network B1 (Hsv) - 37.5 m

Project's Content

icon чертёж.dwg
icon чертёж.pdf
icon ПЗ.docx

Free downloading for today

Update after: 4 hours 26 minutes