The subject of the diploma design is the State Unitary Enterprise of the Republic of Belarus Zilair Forest of the Zilair District of the Republic of Belarus. During the work, the economic activities of the State Unitary Enterprise of Belarus Zilair Forest were analyzed and methods for increasing productivity were proposed. An overview of existing structures where weaknesses were identified was also performed. A mixer has been developed. Engineering calculations were made. The issues of safety and cost-effectiveness of the project are considered. The cost-effectiveness of the project is determined by the fact that the failure of electrical equipment is reduced. The payback period of capital investments is 0.74 years.

Project's Content

icon
icon
icon 1 АХД.rtf
icon 2 Анализ по сущ.rtf
icon 3 ЧАСТЬ расчет.doc
icon 4.doc
icon 4_ekonomika_1.doc
icon 5.docx
icon Библиографический список.doc
icon Введение.rtf
icon 6 экономикаГот.cdw
icon 1_Существующие конструкции.cdw
icon 2_Принципиальная.cdw
icon 3_СБ.cdw
icon 5_Автоматика.cdw
icon .~lock.Реферат 444444.doc#

Additional information

Technical and economic indicators of the project

At the moment, the cost is 1 cubic meter. gas is - 6.35 rubles. Accordingly, the economic effect in this case must be determined based on the difference in gas supply. But at the same time, it is necessary to take into account the cost of new equipment and its installation.

Project Environmental Friendliness

Environmental friendliness refers to a combination of technical and organizational measures that minimize or ideally completely eliminate emissions of material and energy pollution into the biosphere.

All responsibility for the implementation of sanitation measures and the implementation of measures to protect the environment from pollution rests with the head of the enterprise. The bodies of the sanitary and epidemiological service are given the right to prohibit or temporarily suspend the operation of existing facilities if they can cause harm to human health.

Environmental protection requirements are mandatory for all, citizens, officials of all ranks, as well as for collectives of enterprises, institutions and organizations.

Machine-building can create a variety of contaminants. This is due to the wide variety of materials used in mechanical engineering, many types of technological processes and a large assortment of products.

The main technological processes in mechanical engineering are characterized by quite significant noise and vibrations. The most intense noise and vibration during the operation of the technological equipment of forge-press and stamping hammers and presses.

In mechanical engineering, for example, in rolling and steelmaking shops, a large amount of water is used. Waste water of mechanical engineering and metalworking enterprises contains mechanical suspensions of sand, scale, metal chips, etc., as well as various mineral oils.

There are many methods of combating industrial environmental pollution. Conditionally, they are divided into two groups: passive and active. Passive methods include methods that do not directly affect the source of pollution. These are traditional methods that are protective in nature: rational placement of sources of pollution, their localization, purification of emissions.

An example of a rational arrangement of pollution sources can be the location of industrial plants on the leeward side in relation to residential buildings, so that combustion products, harmful gases, soot and dust emitted even in small doses are carried away by the wind towards a relatively free space. A landscaped and landscaped sanitary protection zone is left between the enterprise and the residential area. Localization of pollution sources limits the spread of their harmful effects (for example, painting products by spraying in special chambers).

Drawings content

icon 6 экономикаГот.cdw

6 экономикаГот.cdw

icon 1_Существующие конструкции.cdw

1_Существующие конструкции.cdw

icon 2_Принципиальная.cdw

2_Принципиальная.cdw

icon 3_СБ.cdw

3_СБ.cdw

icon 5_Автоматика.cdw

5_Автоматика.cdw

Free downloading for today

Update after: 15 hours 39 minutes
up Up