• RU
  • icon Waiting For Moderation: 0
Menu

Kindergarten-nursery for 6 groups - ASG diploma

  • Added: 29.07.2014
  • Size: 20 MB
  • Downloads: 0
Find out how to download this material

Description

Thesis project. Drawings, Explanatory Note

Project's Content

icon
icon
icon Аннотация.doc
icon Архитектура.docx
icon БЖД.docx
icon Введение.docx
icon
icon Архитектура.doc
icon БЖД.doc
icon Введение продолжение.doc
icon Введение.doc
icon Заключение.doc
icon Организация.doc
icon основания и фундаменты.doc
icon расчетно-конструкторский.doc
icon Смета.doc
icon Содержание.doc
icon СПИСОК ЛИТЕРАТУРЫ.doc
icon ЭКОНОМИКА.doc
icon Заключение.docx
icon Мой доклад.doc
icon Организация.docx
icon основания и фундаменты.docx
icon расчетно-конструкторский.docx
icon Смета.docx
icon Содержание.docx
icon СПИСОК ЛИТЕРАТУРЫ.docx
icon ЭКОНОМИКА.docx
icon
icon
icon TП 212-1-375c.86 Детский ясли-сад на 6 групп(140 мест) Альбом 1.djvu
icon TП 212-1-375c.86 Детский ясли-сад на 6 групп(140 мест) Альбом 2.djvu
icon TП 212-1-375c.86 Детский ясли-сад на 6 групп(140 мест) Альбом 3.djvu
icon TП 212-1-375c.86 Детский ясли-сад на 6 групп(140 мест) Альбом 5.djvu
icon TП 212-1-375c.86 Детский ясли-сад на 6 групп(140 мест) Альбом 6.djvu
icon
icon ораолаолпа.SPR
icon рама.SPR
icon рама_ar.rtf
icon РСУ основное.docx
icon РСУ при сейсмике.docx
icon усилия.docx
icon
icon ДИПЛОМНЫЙ ПРОЕКТ.dwg
icon
icon ДИПЛОМНЫЙ ПРОЕКТ1.dxf
icon ДИПЛОМНЫЙ ПРОЕКТ2.dxf
icon ДИПЛОМНЫЙ ПРОЕКТ2000.dwg
icon ДИПЛОМНЫЙ ПРОЕКТ2004.dwg
icon ДИПЛОМНЫЙ ПРОЕКТ2007.dwg
icon ДИПЛОМНЫЙ ПРОЕКТ3.dxf
icon
icon к - копия.docx
icon Рамка 1.doc

Additional information

Summary

A diploma project on the topic "Kindergarten-nursery for 6 groups (140 places)," developed in 2011 by a student of the PGSM-061 group of specialization 270102 "Industrial and Civil Construction" of the North Caucasian Humanitarian and Technical Institute of Stavropol.

The diploma project contains a graphic part of 10 sheets and an explanatory note made in the volume of sheets.

In the graphic part, drawings have been developed that give ideas about the architectural, design and structural solutions of the building, as well as drawings of the building construction technology. Architectural construction drawings have been developed on sheets 1 to 5, giving an idea of ​ ​ the space-planning and structural solutions of the building. Sheets 6 to 8 show the design and reinforcement of prefabricated reinforced concrete elements. On the sheets from 9 to 10 the Job Instruction for performance of works on installation of floor slabs, the schedule is developed

The explanatory note describes the decisions made, the necessary calculations, technical and economic indicators, estimated documentation for the construction of the building. The explanatory note is: architectural and construction section, design section, foundation and foundations section, organizational and technological section and economic section, as well as annexes.

The project provides for heat-saving technologies - wall panels made of cellular concrete. New roofing, waterproofing, materials that meet modern requirements.

Introduction

Scientific and technological progress and the underlying changes in technology and production organization are increasingly affecting the nature, composition and pace of trade construction. New processes are widely distinguished, the degree of equipment of buildings and structures with engineering systems is significantly increased.

Progressive technological processes require qualitative changes in the volume planning, architectural, aesthetic and structural solutions of public, administrative buildings and structures. This defines the increasing importance of capital construction as a manufacturing industry. Increasing the efficiency of capital investments is a complex and multi-purpose problem. This should include optimal solutions for their orientation, structure and placement, as well as justify the selection of construction facilities and the clarification of the level of progressivity of design solutions.

Design becomes a decisive area of ​ ​ technological progress, in which projects need to use technological and space-planning solutions that reduce the unused volume of the building and free space, which allow, at lower material costs and labor resources, to obtain a large increase in the space used, as well as an increase in the volume of trade.

In recent years, due to economic difficulties, the volume of construction of new buildings and structures has significantly decreased. Environmental, social, technical and economic requirements were taken into account in the process of designing the kindergarten-nursery complex.

1.1 Design and Construction Input

Diploma project on the topic: "Kindergarten-nursery for 6 groups/140 places in the village of Barsukovskaya, Stavropol Territory."

The construction area belongs to the III climatic area and is characterized by the following data:

- humidity zone is normal;

- design ambient air temperature - 160 С

- prevailing wind direction - east-west;

- average temperature of the coldest five-day period - 210 С;

- maximum depth of seasonal ground freezing - 0.8 m;

- duration of heating period Z = 168 days.

- snow cover weight for the II snow area - 1.20 kPa (design);

- wind speed head for the V wind area - 0.60 kPa (standard);

- seismicity of the construction site - 8 points.

Engineering and geological surveys at the facility were carried out by Inzhgeoproekt LLC on the basis of license No. GS-3-26-02-28-0-26280348-2 (issued on August 6, 2007) and agreement with the developer No. 1808 dated January 23, 2008.

6 engineering-geological elements (EGE) are identified in the section of the site:

EGE-1 - bulk soil with a capacity of 1.1m.

EGE-2 - medium-sized sand, in medium-density state, in wet state. The thickness of the layer is 1.7m.

EGE-3 - Loam hard, wet. In case of emergency soaking, it will be in stable condition. The thickness of the layer is 3.5m.

EGE-4 - Medium sand, medium density, saturated with water. Layer power is 2.2m.

EGE-5 - Clay is refractory, saturated with water, in a stable state. The thickness of the layer is 3.9 m.

EGE-6 - Solid soup saturated with water. The open layer power is 2.6m.

1.2 Master Plan

The master plan of the kindergarten-nursery in the village of Barsukovskaya was developed in accordance with the requirements of the current regulatory documentation in construction .

The site, the construction of kindergarten, is located along Sovetskaya Street, 28 of the village of Barsukovskaya, Stavropol Territory. The site is located near the road, providing good transport connection of the object under construction with the infrastructure of the city. The surface relief of the section is flat with a slight general slope in the east direction. There are no green spaces. Near the site, on the north side, there are utility networks: water supply, sewerage, low-current and electric networks. The site is limited from the north - st. Minsk, from the west - st. New, from the south side - st. Sovetskaya, from the east - the not built-up territory of the neighboring site, on which there are green spaces in the form of coniferous trees. Seismicity of the site according to SNiP II781 * - 8 points.

The project was developed on the basis of the design task.

The project was developed on an area of ​ ​ 4930 m2. The site is characterized by the following geological and climatic indicators: the average maximum temperature of the hottest month is + 24.60, the average annual temperature is + 80, an average of 620 mm falls during the year. precipitation, with their predominance in the warm period; average monthly relative air humidity at 15 h. The coldest month is 53%, the prevailing wind direction is south, the average wind speed for the period with an average daily air temperature of ≤ 80 С 2.3 m/s.

This project has been completed in conjunction with the existing layout around. To ensure normal sanitary and hygienic and aesthetic conditions, the entire territory is landscaped and landscaped. Within the allotted area, an improved lawn is planted. For temporary parking of vehicles, a parking lot is used, for 10 mash ./places, which is located on the street. Sovetskaya. One parking place is a 6x3 m platform. Garbage collection is carried out in garbage collection containers located on the warehouse, which is located on the rear side of the building under construction. Khozdvor is also used to supply food to the institution. The pavement of the driveways is single-layer asphalt concrete, pedestrian paths and a platform in front of the main entrance have a tile surface. Along an asphalt concrete covering the installation of an onboard stone of BR 100.30.15, along tiled - GOST 666591 BR100.20.8 is provided. Existing site elevations are saved as much as possible. Surface water is removed from the building by solid coatings with subsequent discharge to existing coatings.

1.3 Space planning solutions

The kindergarten-nursery project was carried out on the basis of the Urban Planning Plan of the land plot issued by the Committee for Architecture and Urban Planning of Stavropol. The building is designed with a complex shape in plan, which is three rectangular blocks, separated by deformation joints. Each block has two floors. Ruberoid non-exploitable roof. The dimensions of the building in axes are 32000x36000mm.

Access to the building is provided from the street. Sovetskaya and st. Minsk, providing access to fire and service vehicles to all entrances and windows of the building .

Designed building in seismic version in prefabricated monolithic design.

Special shafts are provided for functional support of the internal drain.

As an external wall fence, light concrete panels are adopted. The panel is a flat single-layer structure made of light or cellular concrete, reinforced with a spatial framework. Panels made of light concrete have outer and inner textured layers, 20 and 15 mm thick, respectively. Texture layers are designed from cement sand mortar with average density of 1800 kg/m3 of M100 grade. Panels are manufactured under factory conditions in accordance with GOST II02484.

The storey of the building is 2 floors.

Degree of fire resistance - II.

Building responsibility class -I.

The building includes:

Ground floor

- Reception room

- Playing

- Bedroom

- Toilet room

- Buffeting

- Undress

- Group

- Medical room

- Insulator receiving room

- Chamber

- Toilet insulator

- Room for preparation of disinfectants

- Kitchen handout, procurement workshop

- Washing kitchen utensils

- Dry food pantry

- Vegetable pantry

- Tambour

- Staff bathroom, shower

- Washing, ironing

- Technical room

- Electrical panel

- Corridor, tambour

Second floor

- Undress

- Group

- Bedroom

- Toilet room

- Buffeting

- Music and gymnastics hall

- Storage room for physical education equipment

- Methodological office

- Hall

- Head's Office

- Staff room

- Economic storeroom

- Clean linen pantry

- Shower

- Technical room

- Corridor

1.4 Structural solutions

Source Data

The construction site belongs to the ׀ ׀ ׀ B climatic area and is characterized by the following data:

- Design ambient temperature - (160 С)

- Standard depth of ground freezing - 0.8 m

- Design snow load - 1.20 kPa

- Standard wind load - 0.60 kPa

- Seismicity of construction area - 8 points

- Category of soils by seismic properties - ׀ ׀ category

- Site seismicity - 8 points.

1.6 External and internal finishes

A textured plaster layer with marble crumb "for flushing" using a beige color is applied to the wall panels outside. It is executed in factory conditions.

The basement panels are lined with ceramic tiles of the "Cabanchik" type in factory conditions.

Brick sections of walls indicated in the project are plastered with mortar with marble crumb "for flushing" for the texture of wall panels, using beige coloring.

The staircase fence is painted with beige oil paint.

The wood elements specified in the project are painted with light brown oil paint in two times.

Cover the doors with colorless waterproof varnish.

Windows frames metal-plastic, white

Sidewalk and platforms along the main facades are provided with a coating of

colored paving shaped tiles.

All partitions and walls are covered with improved silicate color to a height of 2.7 m, lime color is higher to the ceiling. Ceilings in all rooms are lime colored. The surface of the walls of the bathrooms, showers and around the washes are lined with glazed ceramic tiles to a height of 1700 mm.

Floors: in the halls and corridors - laminate. In the bathrooms, in the medical room, in the shower - ceramic tiles 30X30cm. In all other rooms - linoleum.

1.7 Sanitary and technical devices

This project solves the issues of internal engineering equipment of the building in 2 floors with a flat roof. Sanitary facilities and indoor microclimate systems include:

- water supply (cold and hot water)

- fire-fighting water supply

- sewerage

- heat supply

- heating

- general exchange ventilation

- smoke protection (in case of fire)

Source Data

The project documentation of the engineering equipment is developed according to requirements of present rules and regulations: Construction Norms and Regulations 2.04.0185 *, Construction Norms and Regulations 41012003, Construction Norms and Regulations 41032003, Construction Norms and Regulations 2.08.0289 *, Construction Norms and Regulations of II781 *, Construction Norms and Regulations 210197 *, Construction Norms and Regulations 230199 *, Construction Norms and Regulations 3.05.0185 *, Construction Norms and Regulations 23022003, Construction Norms and Regulations 12032001, Construction Norms and Regulations 12042002, and also requirements of the Set of rules: Sp121362002, JV 401072003, joint venture 311142004, joint venture 4110298, joint venture 411032000; Fire Safety Rules PPB 012003; state standards: GOST 3049496, GOST 185992001.

Outside air design temperature:

- in the cold period of the year - tn = - 160 С;

- in the warm period of the year - tn = + 24.60 С.

Relative ambient air humidity:

- during the cold period of year - φ = 73%;

- during the warm period of year - φ = 50%.

Average heating temperature - t = + 0.90 C

Heating period duration Z = 168 days.

Construction area - normal humidity mode.

Operating mode of rooms with internal air - normal humidity.

Water supply system

The water supply to the kindergarten-nursery for 6 groups/140 places in the village of Barsukovskaya is carried out from existing networks, while the household drinking needs of the building are provided, as well as watering green courtyard spaces .

The water supply is installed from PPRC PN10 polypropylene pipes. Floor wiring is provided hidden in the floor in the corrugated floor.

The main pipeline is laid in underground channels of the first floor, sewn and heat insulated.

Plumbing of polypropylene pipes is hidden.

Installation, testing and acceptance of cold water supply networks is carried out in accordance with chapter SNiP 3.05.0185. Design water flow rates are determined in accordance with SNiP 2.04.0185 *.

Drawings content

Free downloading for today

Update after: 8 hours 11 minutes
up Up