• RU
  • icon Waiting For Moderation: 21
Menu

High and low pressure gas pipeline to KBA-640 at Orenburg

  • Added: 03.07.2014
  • Size: 317 KB
  • Downloads: 0
Find out how to download this material

Description

Heat supply of the ABK building, the aisle, the driver's rest room and the retail outlet in Orenburg from the block-modular boiler room.

Project's Content

icon
icon интера тс.dwg

Additional information

Drawings content

icon интера тс.dwg

интера тс.dwg

Free downloading for today

Update after: 18 hours 32 minutes
up Up