Heating block-modular boiler house
- Added: 07.03.2025
- Size: 276 KB
- Downloads: 1
Subscribe to receive an information about new materials:
Description
Chelyabinsk region, Nagaybaksky district, p. Nagaybaksky.
Heating block-modular boiler house with a capacity of 0.6 Gcal/hour.
Principle thermal scheme of the boiler house.
Boiler house layout. Plan at elevation 0.000.
Boiler house layout. Section 1-1, 2-2.
Chimneys.
Emergency fuel supply for the boiler house.
Fuel pipeline diagram. Explanation.
Project's Content
|
|
The material is a file that can be opened in program:
- Kompas or KOMPAS-3D Viewer
Similar materials
- 03.07.2014
Free downloading for today
Update after: 15 hours 7 minutes