• RU
  • icon Waiting For Moderation: 18
Menu

Gas supply of the administrative building - built-in boiler room

  • Added: 09.08.2014
  • Size: 228 KB
  • Downloads: 0
Find out how to download this material

Description

The project of gas supply of the built-in boiler house of the building of the ministry XXX is developed according to requirements Construction Norms and Regulations 42-01-2002 Gas-distributing systems and Safety rules of systems of gas distribution and gas consumption.

Project's Content

icon
icon 1139.dwg

Additional information

Drawings content

icon 1139.dwg

1139.dwg
up Up