• RU
  • icon Waiting For Moderation: 0
Menu

Gas supply of a residential building in the Leninsky district of Novosibirsk

  • Added: 16.06.2014
  • Size: 246 KB
  • Downloads: 0
Find out how to download this material

Description

Gas supply project of a residential single-apartment building made of brick. Heat power source-wall boiler. In the kitchen-2 comfort gas stove. Maximum hourly gas flow rate is 2.5m3/h.
Composition of the project:
- General data
- Specification
- External gas pipeline plan. Smoke channel device.
-Plan at el. 0,000. Gas pipeline axonometric diagram.

Project's Content

icon
icon пер.5-й Экскаваторный 8а.dwg
up Up