Electric power supply project in the village of Krasny Gorodok.

  • Added: 15.10.2015
  • Size: 17 MB
  • Downloads: 1
Find out how to download this material

Description

Construction of KTP 250-6/0.4, Red town. Construction of a sprinkle from VL-6 kV No. 4 of the Grabtsevo PS to the KTP. Construction of VL-0.4 kV from KTP to the applicant. Installation of RLN-6 kV at the unsealing point from VL-6 kV No. 4 of the Grabtsevo PS.