• RU
  • icon Waiting For Moderation: 0
Menu

Dry cleaning and laundry - electrification

  • Added: 29.07.2014
  • Size: 490 KB
  • Downloads: 2
Find out how to download this material

Description

Chemical Cleaning Laundry Power Supply Project. It consists of 3 parts. Part 1 Power. Part 2 Power Supply. Part 3 Lighting

Project's Content

icon
icon
icon
icon Общие данные.doc
icon Спецификация оборудования.doc
icon План-сила.dwg
icon Сх. подключения счётчика.dwg
icon Сх. эл.снабжения.dwg
icon
icon Общие данные.doc
icon Спецификация оборудования.doc
icon План-освещение.dwg
icon
icon Общие данные.doc
icon Спецификация оборудования.doc
icon Заземление.dwg
icon План-сила.dwg
icon Распределительная сх..dwg
icon Сх. эл.снабжения.dwg
icon Схема подкл. ВРУ.dwg

Additional information

General Instructions

The project has been completed in accordance with applicable codes, regulations and standards.

Electrical equipment is controlled locally.

The cable section is selected by current load with check for voltage loss and by condition of provision of automatic shutdown of emergency section at single-phase short circuit in accordance with PUE.

Work on laying and installation of the designed electrical networks shall be carried out in compliance with safety regulations and relevant departmental instructions.

In accordance with the requirements of GOST R 5046292, to ensure reliable and safe operation of electrical networks, all elements of electrical circuits (individual pro-drivers) are identified by color:

- zero working (N) blue color;

- zero protective (PE) green-yellow color;

- combined zero and zero protective conductor (PEN) green-yellow along the entire length and light blue at the ends.

Electrical safety measures.

In order to ensure the safety of people from electric shock, it is planned to take electrical equipment and connect metal structures to the grounding loop. In turn, the zero core of the supply cable is connected to the circuit. Power supply of the socket network (except for sockets for connection of computers) is made from bipolar circuit breakers with RCD to Ileaks = 30mA.

Grounding. Potential equalization.

The grounding is performed in accordance with PUE p.7. TNCS grounding system. In order to equalize potentials, all steel structures of the building, as well as water pipes supplied to the building, are connected to the grounding loop. All grounding elements are output to the main grounding bus.

In case the resistance of the grounding device exceeds 10 ohms, additionally install vertical grounding electrodes so that the resistance of the grounding device does not exceed 10 ohms.

By the time of commissioning, all electrical products used in the project must be certified.

Drawings content

icon План-сила.dwg

План-сила.dwg

icon Сх. подключения счётчика.dwg

Сх. подключения счётчика.dwg

icon Сх. эл.снабжения.dwg

Сх. эл.снабжения.dwg

icon План-освещение.dwg

План-освещение.dwg

icon Заземление.dwg

Заземление.dwg

icon План-сила.dwg

План-сила.dwg

icon Распределительная сх..dwg

Распределительная сх..dwg

icon Сх. эл.снабжения.dwg

Сх. эл.снабжения.dwg

icon Схема подкл. ВРУ.dwg

Схема подкл. ВРУ.dwg

Free downloading for today

Update after: 7 hours 19 minutes
up Up