• RU
  • icon Waiting For Moderation: 1
Menu

Typical project 282-3-41 Laundry with a capacity of 5 tons of dry linen per shift

  • Added: 24.06.2015
  • Size: 14 MB
  • Downloads: 0

Description

Typical project 282-3-41 Laundry with a capacity of 5 tons of dry linen per shift.
Contains sections OB, BK, and an air supply (TH).
The file has been converted to a user-friendly PDF.

Project's Content

icon tipovoy-proekt-282-3-41-prachechnaya-proizvoditelnostyu-5-t-suhogo-belya-v-smenu.pdf
The material is a file that can be opened in program:
  • Adobe Acrobat Reader
up Up