Typical project 282-3-41 Laundry with a capacity of 5 tons of dry linen per shift
- Added: 24.06.2015
- Size: 14 MB
- Downloads: 0
Find out how to download this material
Subscribe to receive an information about new materials:
Description
Typical project 282-3-41 Laundry with a capacity of 5 tons of dry linen per shift.
Contains sections OB, BK, and an air supply (TH).
The file has been converted to a user-friendly PDF.
Contains sections OB, BK, and an air supply (TH).
The file has been converted to a user-friendly PDF.
Project's Content
tipovoy-proekt-282-3-41-prachechnaya-proizvoditelnostyu-5-t-suhogo-belya-v-smenu.pdf
|
Similar materials
- 13.04.2022
- 18.05.2020
- 24.01.2023
- 24.01.2023
- 24.01.2023
- 24.01.2023
- 24.01.2023
Free downloading for today
Update after: 9 hours 47 minutes