• RU
  • icon Waiting For Moderation: 17
Menu

Design of the machine shop section for the manufacture of the "Flyanets" part using CNC machines

  • Added: 28.02.2024
  • Size: 3 MB
  • Downloads: 1
Find out how to download this material

Description

CONTENT

 

Introduction

1. Analysis of initial data 

1.1 Description of the design and service purpose of the part..................

Technical Sketch

1.2 Determination of the type of production and its characteristics......................  

1.1.2 Part manufacturability analysis............................................

2. Development of part processing technology

2.1 Recommendations for the development of the design technological process

2.1.1 Basic Process Analysis............................ .

2.1.2 Analysis of technical requirements for the manufacture of the part. Recommendations for their provision and control.................................................... .

2.1.3 Selection of the type and justification of the method of obtaining the workpiece

Descriptions of the method of obtaining a workpiece.......................................... .

2.2.2 Determination of tolerances for workpiece dimensions, allowances for mechanical treatment of surfaces along transitions, calculation of dimensions and weight of the workpiece.........................................................................

2.3 Development of the design technological process 

2.3.1 Preparation of the processing sequence for the designed technological process..........................................................

2.3.1 Selection and justification of technological bases...........................

2.3.2 Dimensional analysis................................................................

2.3.3 Selection of equipment and technological tooling...................

2.4 Operational Process Development

2.4.1 Determination of cutting data for the designed operations. Free Table of Cutting Data ...........................................................

2.4.2 Standardization of designed operations. Free Table of Time Norms...................................................................................

2.4.2 Development of a control program (NC) for machining a part.......

3. Design section

3.1Design analysis of the machine tool

3.1.1Description of the design and operation of the device........

 

3.1.2Calculation of the insertion error of the part in the fixture.........

 

3.1.3 Calculation of the parameters of the power body of the device..................

 

3.2Calculation and design analysis of technological equipment.................................................................................

 

 

 

 

 

The real design part

3.3Design Analysis of Cutting Tools

3.3.1Description of the design of the cutting tool...........................

 

3. 4 Design Analysis of Measuring Tools

3.4.1Description of the design of the measuring tool....................

 

4. Organization of production at the site

4.1Determination of the number of equipment on the site.........

 

4.2 Determination of the number of production workers..................

 

4.3 Organization of work at the site................................................

 

4.4 Development of the site plan and organization of workplaces................

 

4.5 Means of mechanization and automation of technological process elements...................................................................................

5 Energy and resource saving measures..........................

 

6. COMPARATIVE CHARACTERISTICS OF THE BASIC AND DESIGN VARIANTS OF THE TECHNOLOGICAL PROCESS............................

 7 Occupational health and safety and the environment

7.1 General organizational measures for occupational safety...........

7.2 Sanitary and hygienic measures...............................

7.3 Fire-fighting measures...........................................

8. Economic indicators of the project......................................

 

8.1 Determination of the number of industrial and production personnel and wage funds.......................................

8.2 Calculation of Planned Cost by Cost Item.................

8.3    Working capital ratio............................................

 

8.4  Calculation of the annual economic effect.............................

 

Conclusion..........................................................................

Literature...........................................................................

 

 

 

Project's Content

icon
icon
icon
icon МК1.doc
icon МК2.doc
icon
icon КАРТЫ ТП.doc
icon
icon Кэ005.doc
icon Кэ010.doc
icon Кэ020.doc
icon Кэ025.doc
icon Аннотация МС- на английский.doc
icon Аннотация МС-каз.яз.docx
icon Аннотация МС.docx
icon Введение.docx
icon
icon Наладка с ЧПУ.cdw
icon Наладка с ЧПУ.cdw.bak
icon Технологическая наладка _ КП-1014000-2020.cdw
icon Технологическая наладка _ КП-1014000-2020.cdw.bak
icon Технологическая наладка _ КП-10140002-2020.cdw
icon Технологическая наладка _ КП-10140002-2020.cdw.bak
icon Технологическая наладка3.cdw
icon Технологическая наладка3.cdw.bak
icon Деталь Фланец.m3d
icon Записка.docx
icon
icon Заготовка (штамповка на ГКМ) _ КП-1014000-2020.cdw
icon Заготовка (штамповка на ГКМ) _ КП-1014000-2020.cdw.bak
icon Метчик3.cdw
icon Метчик3.cdw.bak
icon На печать-Пробка.cdw
icon На печать-Пробка.cdw.bak
icon Фланец МС-15.cdw
icon Фланец МС-15.cdw.bak
icon
icon план.cdw
icon план.cdw.bak
icon Эконом..cdw
icon Снимок.PNG
icon Снимок1.PNG
icon Снимок2.PNG
icon Снимок3.PNG
icon Снимок4.PNG
icon СОДЕРЖАНИЕ.docx
icon Титульные на комплект технологических документов.doc
icon Титульный лист.docx
icon
icon На печать-Приспособление.cdw
icon На печать-Приспособление.cdw.bak
icon Спецна сверление №1.cdw
icon Спецна сверление №1.cdw.bak
icon
icon Разм. схема 2.cdw
up Up