• RU
  • icon Waiting For Moderation: 0
Menu

Dairy workshop internal power supply working design

  • Added: 25.08.2012
  • Size: 1 MB
  • Downloads: 5
Find out how to download this material

Description

many drawings, description

Project's Content

icon
icon
icon plot.log
icon RO_БЛ.dwg
icon RO_этажа.dwg
icon RS_этажа.dwg
icon Аварийное RO.dwg
icon Заземление.dwg
icon молния.dwg
icon ОС380В.bak
icon ОС380В.dwg
icon План навеса.dwg
icon План силовых линий.dwg
icon План чердака.dwg
icon Проход для проводов и кабелей.dwg
icon РП-1-РП-2.bak
icon РП-1-РП-2.dwg
icon Схема молниезащита.dwg
icon Схема ПЗУ.dwg
icon УСЛ ОБОЗНАЧЕНИЯ.bak
icon УСЛ ОБОЗНАЧЕНИЯ.dwg
icon ЩО-1-ЩО-2.dwg
icon
icon Ведомость СиПД.doc
icon Ведомость_оснчерт.doc
icon Лист1.doc
icon Лист2.doc
icon молниезащита.doc
icon ПЗ1.doc
icon Потеря_Напр.doc
icon Расчёт эл-мощности.doc
icon Расчет короткого замыкания.doc
icon Расчет молниезащиты.doc
icon Расчет ПЗУ.doc
icon Светотех_расчет.doc
icon Содержание.doc
icon Специф_оборуд.doc
icon Спецификация.doc
icon УЗО.doc
icon Учет_Эн.doc

Additional information

Contents

Cover Sheet

License for the design of buildings and structures Register. No. GS-1-99-02-26-0-5018078416-006407-1 dated August 5, 2003

Technical Assignment for Power Supply of Dairy Shop No. 20 dd. 2.02.2005

State Registration Certificate No. 837285 of 22.12.2003

Permission for connection of power No.

EO, C Contents 6-

PP Explanatory Note Cover Sheet

PP-1 - PP-27 Explanatory Note 9-

List of main sets of working drawings

EO Internal power supply cover sheet

0.4 kV single-line design diagram of VRU

Single-line design diagram of BRU-canopy

Single settlement line diagram ShchO-1 0,38 of kV

Single settlement line diagram ShchO-2 0,38 of kV

Single-line design diagram of ShU-vent. 0.38 kV

Single-line design diagram RP-1 0.38 kV 44-

Single-line design diagram RP-2 0.38 kV 46-

Layout of equipment under the canopy

Plan for laying power lines in the attic

Plan of power lines laying from RP-1, RP-2 to equipment

Protective grounding plan

Contents

Dairy Shop Working Lighting Plan

Dairy Shop Emergency Lighting Plan

Bactericidal Lamp Installation Plan

Milk Shop Outlet Group Plan

C Equipment and Material Specification 56-

Accounting for electricity.

To account for electricity in the railway house, which is located at Moscow Region, NaroFominsky District, Petrovsky s/o, TIZ "Rubin," der. Vergolevo, study No. 705, uses a three-phase meter of active energy of the electronic type model SET 4-1 per current 560 A.

The counter is designed to take into account active AC energy in closed rooms at temperatures from minus 25 ° С to plus 55 ° С and relative air humidity up to 98% at temperature + 25 ° С in the absence of aggressive media, vapors and gases in the air.

Accuracy Class 2 counter. The three-phase meter must have a seal on the casing with the stamp of the State Trustee for no more than 12 months.

The counter according to the degree of protection against electric shock is made according to the protection scheme corresponding to the protection class - II (GOST 2610489).

The counter has pulse test outputs.

Energy consumption is taken into account directly in kilowatt-hours (kW*h) by 6 digits of drums located in the panel window.

The meter should be installed in a dry room.

The meter shall be connected to the network by a qualified electrician according to the scheme on the inside of the clamping box cover, as indicated on the clamping block.

The meter shall be installed on the capital walls, on a special stand insulated from the wall. On walls subject to shocks, the installation of counters is not allowed.

Attach the counter with three screws in VR0.4 kV, before that mark the holes under them at the height of 0.41.7 m from the floor level (deviation from vertical position is not more than 1 degree).

After connection of the counter, close the clamping box with cover and seal.

Installation, dismantling, opening, repair, verification and branding shall be carried out only by specially authorized organizations or persons, in accordance with the current rules for the installation of electrical installations. Otherwise, the plant is not responsible for the incorrect operation of the meter.

The meter shall be checked according to LIMG.411152.001 FROM with 6-year interval. Verification is performed as per GOST 3020794.

The presence of readings on the counting mechanism is a consequence of the adjustment and verification of the meter at the factory, and not a consequence of its operation.

Drawings content

icon RO_БЛ.dwg

RO_БЛ.dwg

icon RO_этажа.dwg

RO_этажа.dwg

icon RS_этажа.dwg

RS_этажа.dwg

icon Аварийное RO.dwg

Аварийное RO.dwg

icon Заземление.dwg

Заземление.dwg

icon молния.dwg

молния.dwg

icon ОС380В.dwg

ОС380В.dwg

icon План навеса.dwg

План навеса.dwg

icon План силовых линий.dwg

План силовых линий.dwg

icon План чердака.dwg

План чердака.dwg

icon Проход для проводов и кабелей.dwg

Проход для проводов и кабелей.dwg

icon РП-1-РП-2.dwg

РП-1-РП-2.dwg

icon Схема молниезащита.dwg

Схема молниезащита.dwg

icon УСЛ ОБОЗНАЧЕНИЯ.dwg

УСЛ ОБОЗНАЧЕНИЯ.dwg

icon ЩО-1-ЩО-2.dwg

ЩО-1-ЩО-2.dwg
up Up