• RU
  • icon Waiting For Moderation: 0
Menu

CV sausage shop

  • Added: 14.08.2014
  • Size: 2 MB
  • Downloads: 0
Find out how to download this material

Description

Project heating and ventilation of sausage shop. Kalbas products need a special climate. Drawings in 3 files.



Pulling out of DBE:

To reduce heat loss through the structures in the CP, the plenum devices of the PV1 system are located along the windows in the room of the carcass boarding hall.

Project's Content

icon
icon
icon Kolbas11.dwg
icon Kolbas22.dwg
icon Kolbas33.dwg

Additional information

Drawings content

icon Kolbas11.dwg

Kolbas11.dwg

icon Kolbas22.dwg

Kolbas22.dwg

icon Kolbas33.dwg

Kolbas33.dwg
up Up