Coursework: "Agricultural Machinery Repair Shop"
- Added: 14.10.2015
- Size: 519 KB
- Downloads: 1
Description
Contents: 1. Input to the project and basic information about Process Plan 2. Industrial Plant Master Plan 3. Architectural and structural solution of production building 3.1. Space-planning solution 3.2. Structural solution of production building 4. Calculations and justifications of the parameters of the production building 4.1. Heat engineering calculation of the coating of the production building 4.2. Calculation of natural light of one of the premises of production building 5. Architectural and structural solution of the administrative and domestic building 5.1. Calculation of necessary sanitary and technological equipment and composition of domestic premises 5.2. Space-planning and structural solution of the administrative-domestic building List of used literature
Project's Content
|
генплан.dwg
|
план кровли.dwg
|
план.dwg
|
Пояснительная записка КИРИЛЛ.doc
|
разрез по стене 3-3.dwg
|
разрезы 1-1 и 2-2.dwg
|
узлы.dwg
|
фасад.dwg
|
Additional information
Contents
Project Baselines and Process Plan Basics
Industrial Plant Master Plan
Architectural and structural solution of the production building
Space Planning Solution
Structural solution of production building
Calculations and justifications of production building parameters
Thermal calculation of the coating of the production building
Calculation of natural light of one of the premises of the production building
Architectural and structural solution of the administrative-domestic building
Calculation of necessary sanitary and technological equipment and composition of domestic premises
Space-planning and structural solution of the administrative-domestic building
List of used literature
Project Baselines and Process Plan Basics
Name of production: Agricultural machinery repair shop
Construction area: Arkhangelsk
Enlarged functional-process diagram (Fig. 1)
Composition and areas of the main production departments:
Assembly bench compartment, disassembly 864 m2
Undercarriage repair compartment 576 m2
Separation of components 432 m2
Warehouse of components 288 m2
Pritz Repair Department. canopy. equipment 504 m2
Electrical repair department 216 m2
Overall diagram (Fig. 2)
Space Planning Solution Parameters:
L1 = 24 m
L2 = 12 m
L3 = 60 m
H1 = 12.0 m
H2 = 8.4 m
H3 = 4.2 m
Information on lifting and transportation equipment:
Support bridge crane with lifting capacity Q1 = 10 t
Two overhead cranes with lifting capacity Q2 = 3 t
Category of visual work of the main process IV
Design parameters of internal air in the production building:
Design air temperature 16 ° С
Relative air humidity 55%
Information about the number of employees:
List in all shifts A = 60 people.
Attendance in most mnogochisl. see B = 40 people.
ITR and employees C = 6 people.
30% of working women
Group of the main. industrial processes by sanitary characteristics: 1B
Industrial Plant Master Plan (Fig. 3)
List of buildings and structures shown on the site:
Checkpoint
Enterprise Office
Garage
Dining room
Auxiliary Production Shop Unit
Premises of general organizations
Meeting Room
Dressing room and shower unit
Agricultural machinery repair shop
Power unit
Warehouse
Honey. room
Technological connection of the designed building with adjacent buildings:
The workshop is part of the repair company, including the warranty one.
Used building system: pavilion
Location of the designed building taking into account its orientation relative to the light and dominant winds:
The building shall be made with transverse axes perpendicular to the north direction and longitudinal axes perpendicular to the prevailing wind direction in this area in summer
Main and additional entrances to the industrial zone territory:
The main entrance is made through the passage, additional entrances are located in opposite sides from the main.
Availability of railway transport on site and entry of railway tracks into industrial building:
There is no railway transport on the site. Delivery and export of repaired equipment, spare parts and components - floor rail-free transport.
Architectural improvement of the industrial site:
Sidewalks are located along the entire plane of the site, the width of the sidewalks is 1 m. There is a parking lot for individual transport, you can also use a garage. More than 20% of the area of the enterprise is landscaped using lawns.
Architectural and structural solution of the production building
Characteristics of the industrial building according to the accepted classification:
By purpose: auxiliary production, designed to accommodate auxiliary production processes (repair shop)
By explosion and fire hazard: category G.
The room is connected with the presence of incombustible substances and materials in it in a combustible, hot or molten state, the process of treatment of which is accompanied by the release of radiant heat, sparks and flames.
By capital: Grade II.
Building with high requirements for strength and durability.
In terms of durability: II degree of enclosing structures.
Service life without loss of required qualities at the specified operating mode and in these climatic conditions is not less than 50 years.
By internal mode: heated
By internal humidity mode: normal
For ventilation systems: natural
Natural air exchange in the room, by aeration through light-aeration lights, in order to improve it, the lights are located with their longitudinal axis perpendicular to the dominant wind direction in this area in summer.
By lighting systems: natural.
Uniform lateral illumination of workplaces by natural light in lateral compartments through light openings in external walls, upper one in central ones through light lights in coating.
For internal lifting and transportation equipment: periodic action (overhead and bridge cranes)
Space Planning Solution
Storey: one-story building.
It is characterized by heavy and bulky process equipment, large-sized products and large dynamic loads.
Storefronts: storefronts in the central part of the building
Number of spans: large-span building with three spans
Location of internal supports: span-type building.
The width of the spans prevails over the pitch of the supports
Space Planning Solution Parameters:
Span dimensions: lateral by 12 m, central by 24 m
Height of floors: side by 4.4 m, central 12.0 m
Floor parameters: height 4.2 m, span 24 m, depth 12 m
Evacuation support:
Evacuation is a process of organized independent movement of people from premises in which it is possible to influence them with dangerous fire factors outside. Evacuation is carried out by evacuation routes through exits located at the outer walls of the side and central spans. The gate opens in the direction of exit from the building.
List of rooms, their areas:
Assembly bench compartment, disassembly 864 m2
Undercarriage repair compartment 576 m2
Separation of components 432 m2
Warehouse of components 288 m2
Pritz Repair Department. canopy. equipment 504 m2
Electrical repair department 216 m2
Rest room 18 m2
Offices and Constable. bureau of 6 m2
Latrines of 12 m2
Main technical and economic indicators:
Building area of the industrial building within the external perimeter of external walls Pp = 2989.24 m2
Useful area of production building PP = 2882.56 m2
Architectural and structural solution of the administrative-domestic building
Calculation of necessary sanitary and technological equipment and composition of domestic premises (Table 1)
Space-planning and structural solution of the administrative-domestic building
Plan Building Configuration
The administrative building is a complex of structures located in close proximity to each other.
Main dimensions
Dining room 5 x 4 m
Premises of general organizations 3 x 16 m
Meeting room 6 x 6 m
Dressing room and shower unit 12 x 13 m
Honey. room 6 x 3 m
Number of storeys
One-story buildings with a standard floor height.
Connection to production building
Domestic and administrative premises are located in relation to production facilities in separate buildings.
Technical and economic indicators of the space-planning solution of the administrative and domestic building
building area of the administrative and domestic building within the external perimeter of external walls Pp = 500 m2
useful area of the administrative and domestic building PP = 278 m2
ratio of usable area to total number of employees in all shifts
Kz = 4.63
генплан.dwg
план кровли.dwg
план.dwg
разрез по стене 3-3.dwg
разрезы 1-1 и 2-2.dwg
узлы.dwg
фасад.dwg