• RU
  • icon Waiting For Moderation: 16
Menu

Completion of the construction of residential building No. 3 on Rubinstein Street in MR Sosnovy in the Petrovsky district of Donetsk - electrical part

  • Added: 30.08.2014
  • Size: 1 MB
  • Downloads: 0
Find out how to download this material

Description

The project contains: - General data; Diagram of RP electrical connections - 10 kV after equipment replacement; Diagram of RP electrical connections - 0.4 kV after equipment replacement; TP plan No. 5090 after equipment replacement. M 1:50; TP transformer chamber plan No. 5090 (beginning). M 1:50; The plan of transformer chambers TP No. 5090 with the device of oil receiving sumps. M 1:500; RP plan - 0.4 kV TP No. 5090 after equipment replacement. M 1:500; RP plan - 10 kV TP No. 5090 after equipment replacement. M 1:500; Plan for laying of internal cable and conductor networks in TP No. 5090; Schematic diagram of TP lighting board No. 5090. Consumable Bill of Materials Plan of lighting networks arrangement in substation premises after reconstruction; Cable log; Asbestos cement pass-through slab. MTO per item; Electricity metering board. Appearance. Consumable Material List per Item

Project's Content

icon
icon ЭС LAST.dwg
up Up