CMM layout with vertical section of the building
- Added: 17.05.2017
- Size: 67 KB
- Downloads: 1
Description
For CMM farms, it is necessary to strive for direct flow of production flow in the repair and installation department. When designing the workshop building, we focus on prefabricated reinforced concrete structures. We take the pitch of the columns equal to 6 m. The height of the building in the repair and installation compartment, taking into account the repair of grain harvesters, is 7.2 m. The repair and installation compartment has a span width of 12 m, the remaining sections are located in a span 6 m wide and 4.2 m high. The forge and welding compartment have access to the territory of the engine yard and to the repair and installation compartment.
Project's Content
planirovka1.cdw
|
Additional information
planirovka1.cdw
Similar materials
- 09.07.2014