• RU
  • icon Waiting For Moderation: 0
Menu

City Universal STOA Project

  • Added: 09.07.2014
  • Size: 1 MB
  • Downloads: 1
Find out how to download this material

Description

The file contains a note for 61 pages and three drawings of the A1 format (compass): the general plan, the process layout of the production building, the process layout of the battery maintenance area.

Project's Content

icon
icon
icon Генеральный план.cdw
icon Корпус предприятия.cdw
icon Проектируемый участок.bak
icon Проектируемый участок.bak.cdw
icon спецификация.cdw
icon Записка.docx

Additional information

Contents

Introduction

1 Process calculation of STR

1.1 Calculation of annual scope of work

1.2 Calculation of the number of production workers

1.3 Calculation of the number of work posts and car seats

1.4 Calculation of space areas

1.5 Calculation of Plot Plan Areas

2 Diagram of the organization of technological processes at the universal city car maintenance station

3 Types of performed works at the maintenance and repair station of fuel tank

4 Variants of planning solutions for location of maintenance post and repair of accumulator baths

5 Calculation of technical and economic indicators of STOA

6 Technical and economic evaluation of the project

7 Design of the section for maintenance and repair of the fuel tank. Selection of necessary process equipment

Conclusion

List of used literature

Application

Application

Introduction

One of the most important problems facing road transport is improving the operational reliability of cars. The solution to this problem, on the one hand, is provided by the automotive industry through the production of more reliable cars, on the other hand, by improving the methods of technical operation of cars. This requires the creation of the necessary production base for maintaining the rolling stock in good condition, the widespread use of progressive and resource-saving maintenance and repair processes, effective means of mechanization, robotization and automation of production processes, improving personnel skills, expanding construction and improving the quality of roads.

Requirements for the reliability of vehicles are increased due to the increase in speeds and intensity of traffic, power, load capacity and capacity of cars, as well as with the strengthening of technological and organizational links between road transport and serviced enterprises and other modes of transport.

Road transport consumes a significant amount of spare parts, materials used in maintenance and repair, a variety of technological equipment, accessories and equipment.

Road transport is the largest consumer of fuel for energy resources, the economical use of which depends on the quality of work of power supply systems, electrical equipment, undercarriage and other mechanisms and assemblies of the car, as well as personnel qualifications. An important problem solved by road transport, in particular technical operation, is the use of not only alternative fuels for ICE, but also methods that reduce the influence of their combustion products.

1 Process calculation of STR

Source data.

Type STO: Urban universal.

Brand of serviced cars: VAZ2104; -06; 07; -05.

Average annual mileage: 12,000 km.

Number of fully serviced cars: 3400.

Designed area: accumulator area.

Conclusion

In conclusion, I would like to note that the current state of the automobile service enterprise, which in one way or another reflect the actual state of affairs in the car service market, is stable enough to design and carry out the construction of new ones, or to reconstruct existing car maintenance stations.

The state of the car service enterprise is influenced by many factors, both external and internal: demand for car service services, competitiveness of the enterprise, qualification of working personnel, qualification of management personnel, etc. We must not forget that we live in a motorized society, so the demand for car service services will only increase over time, so designers should think about plans for the future.

Drawings content

icon Генеральный план.cdw

Генеральный план.cdw

icon Корпус предприятия.cdw

Корпус предприятия.cdw

icon Проектируемый участок.bak.cdw

Проектируемый участок.bak.cdw

icon спецификация.cdw

спецификация.cdw

Free downloading for today

Update after: 6 hours 20 minutes
up Up