Boarding School Boiler Rooms
Description
The project provides for the replacement of hot water boilers with Ellprex 1100 boilers of 1.1MW each. It is also necessary to replace the existing GRU with GRU-05-2U1 with two reduction lines (1 in operation, 2 in reserve) with two RDNK-400M regulators and gas metering unit.
Project's Content
|
|
The material is a file that can be opened in program:
- AutoCAD or DWG TrueView
Similar materials
- 01.07.2014
- 03.07.2014
Free downloading for today
Update after: 9 hours 46 minutes
Other materials
- 18.11.2024