Boarding School Boiler Rooms
- Added: 09.08.2014
- Size: 5 MB
- Downloads: 0
Find out how to download this material
Subscribe to receive an information about new materials:
Description
The project provides for the replacement of hot water boilers with Ellprex 1100 boilers of 1.1MW each. It is also necessary to replace the existing GRU with GRU-05-2U1 with two reduction lines (1 in operation, 2 in reserve) with two RDNK-400M regulators and gas metering unit.
Project's Content
674___.dwg
|
Similar materials
- 01.07.2014
- 03.07.2014
Free downloading for today
Update after: 16 hours 8 minutes