• RU
  • icon Waiting For Moderation: 1
Menu

Boarding School Boiler Rooms

Description

The project provides for the replacement of hot water boilers with Ellprex 1100 boilers of 1.1MW each. It is also necessary to replace the existing GRU with GRU-05-2U1 with two reduction lines (1 in operation, 2 in reserve) with two RDNK-400M regulators and gas metering unit.

Project's Content

icon 674___.dwg
The material is a file that can be opened in program:
  • AutoCAD or DWG TrueView
up Up