• RU
  • icon Waiting For Moderation: 45
Menu

Boarding School Boiler Rooms

  • Added: 09.08.2014
  • Size: 5 MB
  • Downloads: 0
Find out how to download this material

Description

The project provides for the replacement of hot water boilers with Ellprex 1100 boilers of 1.1MW each. It is also necessary to replace the existing GRU with GRU-05-2U1 with two reduction lines (1 in operation, 2 in reserve) with two RDNK-400M regulators and gas metering unit.

Project's Content

icon 674___.dwg

Free downloading for today

Update after: 15 hours 11 minutes
up Up