Whole milk replacer workshop with a capacity of 3 tons of finished product per shift
- Added: 18.01.2024
- Size: 415 KB
- Downloads: 0
Subscribe to receive an information about new materials:
Description
In this course project, the Whole Milk Replacer Workshop with a capacity of 3 tons of finished product per shift is presented. At the base of the workshop there is a columnar foundation. The walls are made of wall panels. The dimensions of the building are 42600x24000mm. The shop is located in the Lipetsk region.
Project's Content
|
|
|
|
|
|
|
|
The material is an archive with files that can be opened in programs:
- Microsoft Word
- AutoCAD or DWG TrueView
Similar materials
- 24.01.2023
- 13.04.2022
- 25.01.2024
- 24.01.2023
- 24.01.2023
- 18.05.2020
Free downloading for today
Update after: 7 hours 10 minutes