• RU
  • icon Waiting For Moderation: 0
Menu

VKR Development of technology and equipment for assembly and build-up of shut-off valve

  • Added: 14.05.2021
  • Size: 2 MB
  • Downloads: 4
Find out how to download this material

Description

Graduation Qualification Work (Diploma Project)

Development of technology and equipment for assembly and surfacing of shut-off valve

Project's Content

icon 05.00.000.cdw
icon 01.00.002.cdw
icon 01.00.001.cdw
icon 08.00.000.cdw
icon 03.00.000.cdw
icon 09.00.000cdw.cdw
icon 07.00.000.cdw
icon 01.00.000SP.cdw
icon 04.00.000.cdw
icon 06.00.000.cdw
icon 02.00.000.cdw
icon 01.00.000.cdw

Additional information

Drawings content

icon 05.00.000.cdw

05.00.000.cdw

icon 01.00.002.cdw

01.00.002.cdw

icon 01.00.001.cdw

01.00.001.cdw

icon 08.00.000.cdw

08.00.000.cdw

icon 03.00.000.cdw

03.00.000.cdw

icon 09.00.000cdw.cdw

09.00.000cdw.cdw

icon 07.00.000.cdw

07.00.000.cdw

icon 01.00.000SP.cdw

01.00.000SP.cdw

icon 04.00.000.cdw

04.00.000.cdw

icon 06.00.000.cdw

06.00.000.cdw

icon 02.00.000.cdw

02.00.000.cdw

icon 01.00.000.cdw

01.00.000.cdw
up Up