• RU
  • icon Waiting For Moderation: 22
Menu

Diploma project Organization of maintenance and repair of the machine and tractor park in ZAO "Valkovskoye" s. Rolls of the Lyskovsky district of the Nizhny Novgorod region with the development of a stand for pressing out needle bearings of card

  • Added: 15.01.2020
  • Size: 2 MB
  • Downloads: 17
Find out how to download this material

Description

The completed diploma project on the topic "Organization of maintenance and repair of the machine and tractor fleet in Valkovskoye CJSC of the Lyskovsky district of the Nizhny Novgorod region with the development of a stand for pressing out needle bearings of cardan shafts crosses" consists of a calculation and explanatory note in the amount of 88 pages and a graphic part in the amount of 9 sheets. The first section of the project provides an analysis of the production activities of the enterprise as a whole and separately by subdivisions, provides an analysis of the survival of the enterprise in the new market conditions, shows the significance of auxiliary production, etc. The equipment of the enterprise is reflected in the material and technical base. In the second section, the plant's annual production program for maintenance and repair is calculated. The labor intensity for the implementation of the planned program of the enterprise has been determined. In the structural part of the project there is proposed a stand for pressing out needle bearings of cardan shafts crosses. Strength calculation is given. A route map for pressing out the needle bearing has been drawn up. The fourth section proposes measures to improve the organization and state of labor protection for the repair site and directly for the developed facilities Izm. Sheet No. Document. Signature Date DP Sheet 110304 21 000000 PP Razrab. Pogodin M.S. Prover. Retivin A.G. Review. Bulatov S.Yu. N. Counter. Kosolapovo E.V. Solid. Voronov E.V. Organization of maintenance and repair of the machine and tractor fleet in ZAO Valkovskoye s. Rolls of the Lyskovsky district of the Nizhny Novgorod region with the development of a stand for pressing out needle bearings of cardan shafts. Lit. Sheets of NIEI Figs. FG.09-TOC In the fifth section, a feasibility study of the proposed measures and design development is given.

Project's Content

icon
icon
icon 1. Характеристика, анализ производственной деятельности.docx
icon 2. Разработка производственного процесса ремонта и технического обслуживания.docx
icon 4. Разработка технологического процесса.docx
icon 5. Техника безопасности и охрана труда.docx
icon 6. Экономический раздел.docx
icon Аннотация..docx
icon Выводы и предлдожения.docx
icon Доклад.docx
icon Лист 1.cdw
icon Лист 2.cdw
icon Лист 3.cdw
icon Лист 4.cdw
icon Лист 5.cdw
icon Лист 6.1.cdw
icon Лист 6.2.cdw
icon Лист 7.1.cdw
icon Лист 7.2.cdw
icon Лист 7.3.cdw
icon Лист 7.4.cdw
icon Лист 7.5.cdw
icon Лист 7.6.cdw
icon Лист 7.7.cdw
icon Лист 8.cdw
icon Лист 9.cdw
icon Оборудование лист 1.doc
icon Содержание.docx
icon Спецификация винт-гайка СБ(1).jpg
icon Спецификация винт-гайка СБ(2).jpg
icon Спецификация ВО(1).jpg
icon Спецификация ВО(2).jpg
icon Список литературы.docx
icon Тит. лист и зад..doc
icon Этикетка Пояснительная зап..doc

Additional information

Contents

Contents: c

Introduction

General characteristics of the agricultural organization

1.1 Natural and climatic characteristics of Valkovskoye CJSC

Economic characteristics

General characteristics of the farm repair base

2. Development of repair and maintenance process

2.1 Numerical composition of agricultural equipment

2.2 Calculation of quantity of maintenance and repairs carried out in CMM

2.3 Selection of repair methods and methods, determination of the form of organization of repair works

2.4 Calculation of labor intensity of maintenance works

2.5 Calculation of the required number of production workers

2.5.1 Distribution of works by types and areas

2.5.2 Calculation of the required average annual number of production workers

2.6 Calculation of reconstructed workshop area

2.7 Calculation of lighting of production areas

2.7.1 Calculation of Natural Light

2.7.2 Calculation of artificial lighting

2.8 Ventilation calculation

2.9 Construction of CRM loading schedule

2.10 Determination of maintenance and repairs of MTZ-80 tractor (82) by graphical method

3 Design section

3.1 Kinematic diagram of the designed bench

3.2 Strength calculations of the bench

3.3 Description of bench operation

4 Development of process for disassembly and assembly of cardan shaft hinge

4.1 General Information

4.2 Calculation of time for operations of disassembly and assembly of cardan shaft of MTZ tractor front drive

5 Occupational Safety, Health and Environment

5.1 Safety and Health

5.2 Safety Rules for Bench Operation

5.3 Calculation of climate in the repair area

5.4 Environmental Protection

6 Economic justification of activities

6.1 Economic justification of design solutions

6.2 Economic justification of design development

Conclusions and proposals

List of used literature

Dear Chairman!

Dear members of the State Certification Commission!

A diploma project is presented to your attention on the topic: "Organization of technological maintenance and repair of the machine and tractor park in Valkovskoye CJSC of the Lyskovsky district of the Nizhny Novgorod region with the development of a stand for pressing out needle bearings of cardan shafts crosses"

An important role in solving problems in agricultural production is played by the operability of machinery, the productivity of machine-tractor units, and the reduction of their downtime.

The timely performance of field work, as well as the reduction in the cost of operational materials, largely depends on the timely and high-quality maintenance of tractors.

This is especially necessary at the present time, when the tractor fleet is outdated, the technical resource has decreased, and the purchase of new equipment is carried out in small quantities.

The objectives of our diploma project are: analysis of the production activities of the enterprise; identification of problems in the organization and repair of the machine and tractor fleet.

The objectives of the project are: to calculate the rational organization of the repair and repair of machines, to provide design development and economic justification of the proposed measures.

(SHEET 1) The first sheet of the graphic part shows the analysis of the economic activity of this enterprise (show what indicators are given on the sheet).

(SHEET 2) Based on the planned annual load of tractors monthly and, accordingly, the number of tractors, we calculated the number of maintenance and repairs, then determined the load of the CRM, which is reflected on this sheet of the graphic part.

(SHEET 3) Sheet 3 shows the maintenance and repair schedule of MTZ80 tractor.

(SHEET 4) Next, we calculated the number of production workers based on the labor intensity obtained.

Valkovskoye CJSC has a central repair shop with a total area of ​ ​ 920 m2. This area, based on calculations, is not enough for all maintenance and repairs, and we propose the reconstruction of the CROM with an increase in area by 720 m2.

The obtained central repair shop is shown on sheet 4 of the graphic part.

(SHEET 5) Section 3 of the diploma design presents the development of a bench for pressing out needle bearings of cardan shafts crosses.

The repair of the cardan joint usually consists in the replacement of needle bearings, seals and a spider for which the joint must be disassembled. The bearings in the eyes of the forks are installed with tension, therefore, when disassembling and assembling the hinge, they have to be pressed and pressed accordingly.

The prototype of the designed bench for extrusion of needle bearings of cardan shaft crosses, based on the analysis of structures, accepts the P223 installation. This stand is the easiest and most convenient to use, compact, easy to maintain.

To improve the design, it is proposed to replace the hydraulic transmission with a mechanical one. Mechanical transfer is easy to maintain and manufacture and has higher efficiency (efficiency), smaller dimensions and low cost.

The advantages of the transfer of the "wintbox" include simplicity and compactness of the design, great power gain, accuracy of movements. The disadvantages of this transmission: a large loss on friction and the associated low efficiency.

To increase reliability, firstly, we install two limit position switches, secondly, we will operate the bench with constant pressing of the "back-forward" button and, thirdly, we will equip the working element and belt transmission with a protective casing.

(SHEET 6-7) The graphic part sheets 6 and 7 show the assembly drawings and detail drawings.

(SHEET 8) Sheet 7 shows the production flow chart of the screw shaft used in the power transmission of the presented design.

In section 4, calculations were made of the cost-effectiveness of design solutions as a whole for the workshop and the proposed design development.

(SHEET 9) Sheet 9 of the graphic part shows the results of the economic part of the diploma project .

Summary

The completed diploma project on the topic "Organization of maintenance and repair of the machine and tractor fleet in Valkovskoye CJSC of the Lyskovsky district of the Nizhny Novgorod region with the development of a stand for pressing out needle bearings of cardan shafts crosses" consists of a calculation and explanatory note in the volume of pages and a graphic part in the volume of 9 sheets.

The first section of the project provides an analysis of the production activities of the enterprise as a whole and separately by subdivisions, provides an analysis of the survival of the enterprise in the new market conditions, shows the significance of auxiliary production, etc. The equipment of the enterprise is reflected in the material and technical base.

In the second section, the plant's annual production program for maintenance and repair is calculated. The labor intensity for the implementation of the planned program of the enterprise has been determined.

In the structural part of the project there is proposed a stand for pressing out needle bearings of cardan shafts crosses. Strength calculation is given. A route map for pressing out the needle bearing has been drawn up.

The fourth section proposes measures to improve the organization and state of labor protection for the repair site and directly for the developed plant.

The fifth section gives a feasibility study of the proposed measures and design development.

Conclusions and proposals

To improve the state of maintenance and repair in the farm during the design, a program of maintenance and repair of the machine and tractor fleet was developed. Labor intensity of maintenance and repair of tractors in 2011 is determined. You have defined the need for and the number of service personnel. The CPM loading plan is proposed.

The developed schedule for the maintenance and repair of tractors in 2011 will ensure timely and better performance of all works in accordance with the organizational and technological charts for their implementation.

The implementation of the developed project will reduce the cost of repairing tractors by 20% due to an increase in maintenance costs and obtain savings of 393 thousand rubles. for one year.

Additional capital investments will amount to 1199 thousand rubles, the payback period will be 3 years.

The introduction into production of a stand for pressing out needle bearings of cardan shafts crosses will reduce the cost of wages due to a decrease in the labor intensity of repairs. The payback period for design development will be 4.3 years with a construction cost of 22,450 rubles. Annual savings will be 5200 rubles.

Drawings content

icon Лист 1.cdw

Лист 1.cdw

icon Лист 2.cdw

Лист 2.cdw

icon Лист 3.cdw

Лист 3.cdw

icon Лист 4.cdw

Лист 4.cdw

icon Лист 5.cdw

Лист 5.cdw

icon Лист 6.1.cdw

Лист 6.1.cdw

icon Лист 6.2.cdw

Лист 6.2.cdw

icon Лист 7.1.cdw

Лист 7.1.cdw

icon Лист 7.2.cdw

Лист 7.2.cdw

icon Лист 7.3.cdw

Лист 7.3.cdw

icon Лист 7.4.cdw

Лист 7.4.cdw

icon Лист 7.5.cdw

Лист 7.5.cdw

icon Лист 7.6.cdw

Лист 7.6.cdw

icon Лист 7.7.cdw

Лист 7.7.cdw

icon Лист 8.cdw

Лист 8.cdw

icon Лист 9.cdw

Лист 9.cdw

Similar materials

Free downloading for today

Update after: 13 hours 4 minutes
up Up