• RU
  • icon Waiting For Moderation: 0
Menu

Ventilation of the workshop for the production of non-standardized equipment

  • Added: 05.11.2024
  • Size: 2 MB
  • Downloads: 0
Find out how to download this material

Description

In this course project, the ventilation system for the workshop of non-standard equipment manufacturing located in the city of Bugulma has been designed.

 The workshop includes:

1. Preparatory and assembly work area;

2. Tool storage and distribution area;

3. Forge and welding area;

4. Painting area;

5. Compressor room.

Project's Content

icon plan.dwg
icon Prom_vent.docx
up Up