• RU
  • icon Waiting For Moderation: 9
Menu

Ventilation of the assembly and chipping shop

  • Added: 22.08.2023
  • Size: 2 MB
  • Downloads: 4
Find out how to download this material

Description

In this course project, the ventilation of the prefabricated chip shop located in the city of Kurgan is designed. The workshop includes a drying department, a ventilation chamber, a master's room, a laboratory room, a machining department, a ventilation chamber, utility rooms, a pantry. The number of employees per shift is 40 people. The orientation of the façade to the North. Coolant - water 130 - 150C. 

The explanatory note provides the location of the air parameters indoors and outdoors; calculations of the volumes of air supplied by the supply system and removed by local suction; aerodynamic calculation of the supply system; The selection of equipment for supply and exhaust systems was made.

Project's Content

icon Сборочно-сколочный цех.dwg
icon Пояснительная записка.doc

Free downloading for today

Update after: 3 hours 27 minutes
up Up