Ventilation of the assembly and chipping shop
- Added: 22.08.2023
- Size: 2 MB
- Downloads: 4
Find out how to download this material
Subscribe to receive an information about new materials:
Description
In this course project, the ventilation of the prefabricated chip shop located in the city of Kurgan is designed. The workshop includes a drying department, a ventilation chamber, a master's room, a laboratory room, a machining department, a ventilation chamber, utility rooms, a pantry. The number of employees per shift is 40 people. The orientation of the façade to the North. Coolant - water 130 - 150C.
The explanatory note provides the location of the air parameters indoors and outdoors; calculations of the volumes of air supplied by the supply system and removed by local suction; aerodynamic calculation of the supply system; The selection of equipment for supply and exhaust systems was made.
Project's Content
Сборочно-сколочный цех.dwg
|
Пояснительная записка.doc
|
Similar materials
- 18.09.2022
- 01.07.2014
- 27.07.2022
Free downloading for today
Update after: 17 hours 39 minutes
Other materials
- 24.04.2014