• RU
  • icon Waiting For Moderation: 1
Menu

Ventilation of the assembly and chipping shop

Description

In this course project, the ventilation of the prefabricated chip shop located in the city of Kurgan is designed. The workshop includes a drying department, a ventilation chamber, a master's room, a laboratory room, a machining department, a ventilation chamber, utility rooms, a pantry. The number of employees per shift is 40 people. The orientation of the façade to the North. Coolant - water 130 - 150C. 

The explanatory note provides the location of the air parameters indoors and outdoors; calculations of the volumes of air supplied by the supply system and removed by local suction; aerodynamic calculation of the supply system; The selection of equipment for supply and exhaust systems was made.

Project's Content

icon Сборочно-сколочный цех.dwg
icon Пояснительная записка.doc
The material is an archive with files that can be opened in programs:
  • AutoCAD or DWG TrueView
  • Microsoft Word
up Up