In this course project, the ventilation of the industrial building of the blacksmith shop located in Vileika was designed.
The following equipment is installed in the shop:
- forge miner for one fire, 3 pcs.;
- forging hammer;
- bath for alkaline washing;
- forge mountain for two lights, 3 pcs;
The following process operations are performed in the shop:
- heating of metal for forging in furnaces or coils with bringing the heating temperature to 1150 eta1250 ° C.
Project's Content
Промка Вентиляция.docx
|
граф чать Промка.dwg
|
Additional information
Contents
1. Brief description of the building and process equipment
2. Determination of heat losses and heat inputs
2.1. Calculation of heat losses
2.2. Calculation of Heat Inputs
3. Select the local suction design. Calculation of the amount of air removed by local suction
5. Calculation of air exchanges
6. Aeration calculation
6.1. Aeration Calculation for Warm Season
6.2. Aeration calculation for the transition period of the year
7. Calculation of ventilation systems equipment
8. Aerodynamic calculation
Literature
граф чать Промка.dwg