• RU
  • icon Waiting For Moderation: 1
Menu

Ventilation of industrial building (Blacksmith shop) - coursework

Description

In this course project, the ventilation of the industrial building of the blacksmith shop located in Vileika was designed.

The following equipment is installed in the shop:

- forge miner for one fire, 3 pcs.;

- forging hammer;

- bath for alkaline washing;

- forge mountain for two lights, 3 pcs;

The following process operations are performed in the shop:

- heating of metal for forging in furnaces or coils with bringing the heating temperature to 1150 eta1250 ° C.

Project's Content

icon Промка Вентиляция.docx
icon граф чать Промка.dwg
The material is an archive with files that can be opened in programs:
  • Microsoft Word
  • AutoCAD or DWG TrueView

Additional information

Contents

1. Brief description of the building and process equipment

2. Determination of heat losses and heat inputs

2.1. Calculation of heat losses

2.2. Calculation of Heat Inputs

3. Select the local suction design. Calculation of the amount of air removed by local suction

5. Calculation of air exchanges

6. Aeration calculation

6.1. Aeration Calculation for Warm Season

6.2. Aeration calculation for the transition period of the year

7. Calculation of ventilation systems equipment

8. Aerodynamic calculation

Literature

Drawings content

icon граф чать Промка.dwg

граф чать Промка.dwg
up Up