• RU
  • icon Waiting For Moderation: 21
Menu

Ventilation of industrial building

  • Added: 03.07.2014
  • Size: 1 MB
  • Downloads: 0
Find out how to download this material

Description

Course project 'ventilation of industrial building: galvanic and woodworking workshop'. The project contains drawings of plans and sections of the workshops with ventilation and pneumatic transportation systems, explication of the equipment of the workshops, a diagram of the calibration of one of the systems, an on-board suction drawing, a drawing of the plenum chamber with the specification of the equipment included in it, axonometric diagrams of all systems, as well as an explanatory note to the project and attached excel files with calculations

Project's Content

icon
icon
icon Пром ДК.xlsx
icon ПромВент ДК.docx
icon ПромВент ДК.xlsx
icon Чертеж ДК.cdw

Additional information

Contents

1. Source Data

2. Thermal calculation of external enclosures

2.1 Thermal design of the outer wall

2.2 Overlap

2.3 Windows

3. Calculation of heat losses of the structure

4. Heat generation in woodworking shop

5. Heat generation in galvanic shop

6. Heat balance of woodworking shop

7. Thermal balance of the electroplating shop

8. Calculation of amount of air removed from baths in HZ

9. Calculation of the amount of air to be removed from the machines in the woodworking shop

10. Determination of supply air volume and parameters

10.1 Galvanic Workshop

10.2 Woodworking Shop

11. Design and calculation of plenum ventilation system

11.1 Calculation and selection of air distributors

11.2 Calculation and selection of air intake screens

11.3 Aerodynamic calculation of plenum ventilation systems

11.4 Selection of ventilation systems plenum chambers equipment

11.4.1 Selection of insulated valve for U system

11.4.2 Selection of A system filter

11.4.3 Selection and calculation of C system calorifers

11.4.4 Selection of the fan of system P

11.5 Selection of equipment of plenum chambers of ventilation systems using the program Kckpmnuser _ 2010 _

11.5.1 P1 and P systems

11.5.2 System P

12. Exhaust systems via local suction

12.1 Selection of filters

12.2 Aerodynamic calculation

12.3 Selection of Fans

Exhaust System B

Exhaust System B

Exhaust System B

Exhaust System B

13. Aerodynamic calculation of aspiration and pneumatic transport system

13.1 Calculation of aspiration system ducts

13.2 Calculation of pressure losses and selection of AITR system equipment

14. Selection of deflectors for general ventilation

Literature

Application

Drawings content

icon Чертеж ДК.cdw

Чертеж ДК.cdw
up Up