Uute project of school N820 (BNK). To organize the accounting of water consumption for the needs of the GVA received by the BNK of school No. 820, it is proposed to equip the entry into each group with a water meter

Project's Content

icon
icon
icon ПРОЕКТ.doc
icon Титул.doc
icon Школа 820.dwg
icon Школа_820_специфиукация.doc

Additional information

Introduction

The working design of the hot water flow metering unit for WAN needs was developed on the basis of the following documents:

Procedure for determination of maximum and minimum coolant and water flow rates at heat stations when selecting heat and water meters. M.A. Lapir, Office of Fuel and Energy Economy of the Government of Moscow, 27.10.98;

SNiP 2.04.0185 * INTERNAL WATER SUPPLY AND SEWERAGE OF BUILDINGS

SP-41-101-95. Design of heat stations;

Rules of heat energy and coolant accounting.;

Rules for the use of thermal energy. PR347001085.;

MEASURING CONTROLLER "SPKM102," operation manual.

Counters hot and VSH, VSG, VST cold water, passport of PSP

4213-001-03215076-92

Magnetic coupling filters FMM 15.20.25.32.40, passport

5975.00.00 PS

Sealing

After installation works, the water meters, terminal boxes and the computer board shall be sealed by representatives of the heat supply organization.

Instructions for installation of equipment

During installation works the requirements of SNiP 3.05 shall be met. 0185; 3.05. 0385; 3.05.0785, as well as SNiP Sh-4-80 "Safety in construction" and fire safety standards;

During installation of pipelines and equipment, tightness and strength of elements attachment shall be ensured;

Before installation make sure that there are seals on the equipment;

Primary transmitters shall be installed in accordance with manufacturer and design instructions;

The measurement and calculation unit is installed in a separate board;

Wires or cables from the primary transmitter shall be laid in steel pipes, metal pipes or cable channels of MKS REHAU;