• RU
  • icon Waiting For Moderation: 5
Menu

Tie-in unit to the existing PE gas pipeline by side exit using the transmission device

  • Added: 09.08.2014
  • Size: 4 MB
  • Downloads: 0
Find out how to download this material

Description

Gas pipeline route and tie-in unit to existing PE gas pipeline by side exit with the help of transmission device without pressure reduction in existing

Project's Content

icon
icon узел врезки.dwg

Additional information

Drawings content

icon узел врезки.dwg

узел врезки.dwg
up Up