Tie-in units to PE gas pipeline, units of test tube installation on the case

- Added: 01.06.2020
- Size: 2 MB
- Downloads: 2
Get free access by adding your material or get a discount by paying for multiple materials at once
Subscribe to receive an information about new materials:
Description
Detailed drawing of tie-in units into the existing gas pipeline using the tie-in technology without disconnecting Perfect3 gas. Tie-in of gas pipeline D 110 and D 32 with installation of underground crane. Also attached are units of control tube installation on PE case. An explication of the main materials is attached to all nodes. The units are completed for the working design according to the current regulatory documentation.
Project's Content
![]() ![]() ![]() |
Similar materials
- 29.07.2014
- 09.08.2014
Free downloading for today
Update after: 3 hours 17 minutes