• RU
  • icon Waiting For Moderation: 58
Menu

Steam and water boiler house gas supply

  • Added: 09.08.2014
  • Size: 955 KB
  • Downloads: 1
Find out how to download this material

Description

Installation of GRU in the boiler room and commercial gas flow metering unit, as a part of drawings: - General data - Plan for 0.0.000. Cut 1-1. OP-2, OP-4. Attachment of blowdown candles to wall - Section 2-2.

Project's Content

icon
icon gaz_par_kot.dwg

Additional information

Drawings content

icon gaz_par_kot.dwg

gaz_par_kot.dwg
up Up