• RU
  • icon Waiting For Moderation: 16
Menu

Smoke removal project in a residential building

  • Added: 30.08.2014
  • Size: 425 KB
  • Downloads: 2
Find out how to download this material

Description

Residential building in Novy Urengoy (smoke removal). Graphic part, explanatory note

Project's Content

icon
icon
icon Дымоудаление.dwg
icon Записка дымоудаление.doc

Additional information

Explanatory Note

This section of the project implemented power supply networks of the smoke removal and fire extinguishing system.

According to reliability of power supply, electric receivers of these systems belong to the I category. Electrical receivers are powered through ALT cabinet. The project provides for the accounting of electricity.

The smoke removal system consists of fans PD1 and HD1, which are switched on when opening valves of any floor.

The fire extinguishing system consists of 2 fire pumps PN1 and PN2, one working and another standby.

For control of smoke removal and fire extinguishing systems "BOLID" control start-up cabinets are used.

Distribution and group networks are made with PV1 wire, IWG cable, IWG in pipes.

Protective measures for electrical safety were taken within the scope of the TN C-S grounding system.

Drawings content

icon Дымоудаление.dwg

Дымоудаление.dwg
up Up