• RU
  • icon Waiting For Moderation: 0
Menu

Shopping centre and fast food restaurant

  • Added: 03.07.2014
  • Size: 4 MB
  • Downloads: 1
Find out how to download this material

Description

Automatic installation of water fire extinguishing

Project's Content

icon
icon
icon Разводка_5_этаж.dwg
icon Разводка_6_этаж.dwg
icon Разводка_технического_этаж.dwg
icon спецификация.dwg
icon схемаАПТ.dwg
icon
icon ЖУРНАЛ.doc
icon задание.doc
icon новый тит.DOC
icon пояснительная.doc
icon Насосная станция.dwg
icon Общие данные АПТ1.dwg
icon подвал.dwg
icon Разводка_1_этаж.dwg
icon Разводка_2_этаж.dwg
icon Разводка_3_этаж.dwg
icon Разводка_4_этаж.dwg
icon схемаАПТ.bak
icon
icon ЗД1.dwg
icon ЗД2.dwg
icon ЗД3.dwg
icon насосная станция.dwg
icon Общая спецификация.dwg
icon Общие данные.dwg
icon Разводка_ всех_этажей.dwg
icon Второй лист.doc

Additional information

Source Data:

1. Architectural and construction drawings

2. Terms of Reference

The project has been completed in accordance with the requirements of:

- NPB 882001 * "Fire fighting and alarm units. Design Codes and Regulations, "

- NPB 11003 "List of buildings, structures, premises and equipment to be protected by automatic fire extinguishing units and automatic fire alarm,"

- PUE "Electrical Installation Rules,"

- GOST R 50571.1597 " Electrical installations of buildings."

- PPB0193 "Fire safety rules in the Russian Federation."

- SniP 2.08.0289 * "Public buildings and structures";

The automatic installation of water fire extinguishing is equipped with the Shopping Center and fast food restaurant located at St. Petersburg, Petrograd Administrative District crossing Maly Ave., Rybatskaya and Izhora Streets.

The project used the equipment of the company "Sweet." Central device CP1M is installed in the control room with round-the-clock duty on the 2nd floor (o.206). Cases of switching 1ShKA, 2ShK-A, AVR, SKSB, SZSB, BUPN1, 1BSU...8BSU blocks, the RU1, RU2 level switch and the BRP uninterruptible power supply unit are installed in the pump station in the basement (room 007).

The equipment used provides:

automatic start-up of the working pump;

automatic start of standby pump in case of failure of operating pump to the mode;

local shutdown of pumps from cases of switching of 1ShKA; 2SHK-A;

local turning on of pumps from cases of switching of 1ShKA; 2SHK-A;

shutdown of automatic launch of pumps from cases of switching of 1ShKA; 2SHK-A ;

voltage monitoring at operating and standby inputs;

check of electric contact pressure gauge lines integrity;

control of pressure in the automatic pressurizer tank;

generation of command pulses for ventilation shutdown;

generation of command pulses for excalators locking;

automatic and local control of the electric gate valve for replenishment of the tank from the SHZSB switching cabinet;

automatic monitoring of the emergency level in the tank and in the drain pit;

check of the position of the valve for replenishment of the tank (open, closed);

monitoring of absence of complete opening of the valve for tank replenishment in the mode of command for its opening.

The following light and sound alarms are output to CP1M device:

- on fire occurrence;

- about pumps start-up;

- on disconnection of automatic pump start-up;

- on absence of power supply at inputs;

- failure of electrical circuits;

- on pressure drop in the vessel;

- about the emergency level in the tank and in the drain pit;

- on the position of the valve (open, closed);

- on absence of complete opening of the valve for tank replenishment in the mode of command for its opening.

The design provides for isolation of ventilation, activation of warning, blocking of excalators from the contact of the CP1M device installed in the control room. Activation of the smoke removal system during the fire is provided from the surge contacts of the BSU units installed in the pump station room.

Drawings content

icon Разводка_5_этаж.dwg

Разводка_5_этаж.dwg

icon Разводка_6_этаж.dwg

Разводка_6_этаж.dwg

icon Разводка_технического_этаж.dwg

Разводка_технического_этаж.dwg

icon спецификация.dwg

спецификация.dwg

icon схемаАПТ.dwg

схемаАПТ.dwg

icon Общие данные АПТ1.dwg

Общие данные АПТ1.dwg

icon подвал.dwg

подвал.dwg

icon Разводка_1_этаж.dwg

Разводка_1_этаж.dwg

icon Разводка_2_этаж.dwg

Разводка_2_этаж.dwg

icon Разводка_3_этаж.dwg

Разводка_3_этаж.dwg

icon Разводка_4_этаж.dwg

Разводка_4_этаж.dwg

icon ЗД1.dwg

ЗД1.dwg

icon ЗД2.dwg

ЗД2.dwg

icon ЗД3.dwg

ЗД3.dwg

icon насосная станция.dwg

насосная станция.dwg

icon Общая спецификация.dwg

Общая спецификация.dwg

icon Общие данные.dwg

Общие данные.dwg

icon Разводка_ всех_этажей.dwg

Разводка_ всех_этажей.dwg

Free downloading for today

Update after: 16 hours 52 minutes
up Up