Routing for Concrete Works
Description
Typical Job Instruction is developed for pile pile concreting. The works considered for concreting include: - reinforcement of pedestals (monolithic slab). - formwork device. - concreting of ponds (monolithic slab). - disassembly of formwork..
Project's Content
|
|
The material is a file that can be opened in program:
- AutoCAD or DWG TrueView
Additional information
Drawings content
tehnologicheskaya-karta-na-proizvodstvo-betonnyh-rabot.dwg
Similar materials
- 24.04.2014
- 24.04.2014
Free downloading for today
Update after: 16 hours 48 minutes