• RU
  • icon Waiting For Moderation: 0
Menu

Routing for Concrete Works

  • Added: 18.04.2020
  • Size: 136 KB
  • Downloads: 3
Find out how to download this material

Description

Typical Job Instruction is developed for pile pile concreting. The works considered for concreting include: - reinforcement of pedestals (monolithic slab). - formwork device. - concreting of ponds (monolithic slab). - disassembly of formwork..

Project's Content

icon tehnologicheskaya-karta-na-proizvodstvo-betonnyh-rabot.dwg

Additional information

Drawings content

icon tehnologicheskaya-karta-na-proizvodstvo-betonnyh-rabot.dwg

tehnologicheskaya-karta-na-proizvodstvo-betonnyh-rabot.dwg
up Up