Routing for Concrete Works

- Added: 18.04.2020
- Size: 136 KB
- Downloads: 3
Find out how to download this material
Subscribe to receive an information about new materials:
Description
Typical Job Instruction is developed for pile pile concreting. The works considered for concreting include: - reinforcement of pedestals (monolithic slab). - formwork device. - concreting of ponds (monolithic slab). - disassembly of formwork..
Project's Content
![]() ![]() ![]() ![]() |
Additional information
Drawings content
tehnologicheskaya-karta-na-proizvodstvo-betonnyh-rabot.dwg

Similar materials
- 24.04.2014
- 24.04.2014
Free downloading for today
Update after: 2 hours 51 minutes
- 23.02.2023