Removal of the 6 kV overhead line from the site

  • Added: 12.01.2024
  • Size: 7 MB
  • Downloads: 1
Find out how to download this material

Description

The project implements the removal of the 6 kV overhead line of the grid organization from the land plot for the implementation of integrated development. The newly designed line is made on reinforced concrete supports with SIP-3 wire.