• RU
  • icon Waiting For Moderation: 17
Menu

Removal of the 6 kV overhead line from the site

  • Added: 12.01.2024
  • Size: 7 MB
  • Downloads: 0
Find out how to download this material

Description

The project implements the removal of the 6 kV overhead line of the grid organization from the land plot for the implementation of integrated development. The newly designed line is made on reinforced concrete supports with SIP-3 wire.

Project's Content

icon 200297_Ленино, кад.264 (Вынос)_План трассы_1.dwg
icon 200297_Ленино, кад.264 (Вынос)_Проект1.dwg

Free downloading for today

Update after: 22 hours 44 minutes
up Up