Removal of the 6 kV overhead line from the site
- Added: 12.01.2024
- Size: 7 MB
- Downloads: 1
Find out how to download this material
Subscribe to receive an information about new materials:
Description
The project implements the removal of the 6 kV overhead line of the grid organization from the land plot for the implementation of integrated development. The newly designed line is made on reinforced concrete supports with SIP-3 wire.
Project's Content
200297_Ленино, кад.264 (Вынос)_План трассы_1.dwg
|
200297_Ленино, кад.264 (Вынос)_Проект1.dwg
|
Similar materials
- 18.05.2023
- 04.11.2022
- 24.04.2014
Free downloading for today
Update after: 15 hours 38 minutes
Other materials
- 08.10.2021