Reconstruction of the building of the SMU pre-assembly workshop

  • Added: 14.06.2024
  • Size: 16 MB
  • Downloads: 1
Find out how to download this material

Description

Initial data for the thesis: Situational plan of the industrial site of the SMU "SEM". Regulatory framework for the design of the reconstruction of industrial buildings. 

Typical flow chart for the installation of sandwich panels and fence panels.

 

Contents of the thesis (list of issues to be developed): 

 

INTRODUCTION

1. ARCHITECTURAL AND STRUCTURAL SECTION

1.1 Characteristics of the construction area

1.2 Structural and space-planning solution of the building

1.3 Heat engineering calculation, engineering networks

 

2. ORGANIZATIONAL AND TECHNOLOGICAL SECTION

2.1 Technological map for masonry works

2.2 Development of a construction schedule

2.3 Development of a construction master plan

2.4. Selection of machines and mechanisms for the construction of the facility

 

3SECTION ON ECOLOGY AND SAFETY OF PROJECT SOLUTIONS

3.1 Safety precautions in the organization of the construction site

3.2 Fire prevention measures

3.3 Environmental protection measures

 

4. ECONOMIC SECTION 

4.1 Determination of the cost of construction in object and local estimates

4.2 Calculation of technical and economic indicators of the construction object

 

Introduction

In connection with the release of the area of the assembly and procurement shop, it was decided to transfer the equipment of the pre-assembly shop to the vacated area, and in this regard, the issue of reconstruction of the building of the Pre-Assembly Shop and the construction of a garage for motor vehicles became relevant. The main task of the garage of motor vehicles is the transportation of personnel, materials, cargo of the instrumentation and tool base, as well as the performance of installation, construction and procurement works.

Recently, an inspection and assessment of the technical condition of the building was carried out, during which defects in the wall panels were found, which do not allow the continuation of the normal operation of this building.

Given the harsh climatic conditions and aggressive operating environment, the technical characteristics of structures and building elements deteriorate much faster. In this regard, it is necessary to use modern materials that are more resistant to aggressive conditions.

To ensure the normal functioning of the building, the workshop for the pre-assembly of structures in the Norilsk district, reconstruction measures were developed:

  • Replacement of the roof covering;
  • dismantling of wall panels;
  • Installation of wall panels

The reconstruction of this building is necessary to improve the quality in accordance with the new requirements and technical re-equipment.

In this graduate qualification work, the issue of timely diagnosis and treatment of the population of Vladivostok is considered.

The subject of this research is the design of medical centers.

A project has been developed for the reconstruction of the building of the SMU pre-assembly workshop

"Spetselectromontazh" LLC "PSMK".

In the work, architectural, planning and structural solutions were worked out, the calculation of the main structures was made, the necessary economic calculations of the cost of construction of the facility were made, the issues of organization, planning, construction management and labor protection requirements were considered.

Project's Content

icon Чертежи5-7.dwg
icon Чертеж.dwg
icon Чертежи3.dwg
icon Чертежи4.dwg
icon ВКР Luna.docx
icon Чертежи1-2.dwg

Free downloading for today

Update after: 9 hours 38 minutes
up Up