Object: Office building. Project developer: no data. Year of project release: 2011. Systems: Radiofacing

Project's Content

icon
icon
icon
icon Общие данные_inkognito.dwg
icon Планы_inkognito.dwg
icon Пояснительная записка РТ_inkognito.doc
icon Размещение оборудования на кровле_inkognito.dwg
icon Спецификация РТ.doc
icon Схема структурная_inkognito.dwg
icon Схема функциональная РТ_inkognito.dwg
icon Схемы подключения коробок РТ_Inkognito.dwg

Additional information

Contents

1 General part

2 Brief description of the object

3 Main Design Solutions

3.1 External networks

3.2 Wired Radio Subscriber Network

4 Lightning protection and grounding

5 Safety and Health

1 General part

This working draft contains decisions on connection to the wired radio broadcasting network and organization of the radio broadcasting system in the building at the address: Moscow, * * * * * * * * * * * * * * * * * * *

Engineering decisions are made on the basis of the following initial, technical and regulatory documentation:

- PSD Contract No. 1248/11;

- engineering specification;

- drawings of architectural and planning solutions provided by the customer;

- building codes, regulations, instructions and standards for the design of buildings of this purpose, including:

SNiP 2.09.0487 "Administrative and household buildings";

SniP 31052003 "Public administrative buildings";

SNiP 2.08.0289 "Public buildings and structures";

VSN 6089 "Communication, alarm and dispatching devices for engineering equipment of residential and public buildings. Design Standards ";

OSTN 60093 "Industry Construction and Technological Standards for Installation of Communication, Broadcasting and Television Facilities and Devices"

SNiP 3.05.0685 "Electrical devices";

PUE (Issue 7) "Electrical Installation Rules";

SNiP 12032001 "Occupational safety in construction. Part 1. General requirements. "

2 Brief description of the object

In the building at the address * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

Functional purpose - * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

The building is three-story with a basement and a technical floor, with two communication stairs. The building has a passenger elevator (it does not drop into the basement).

Total building area:

- according to BTI - 1 949.3 m2;

- according to the results of the survey - 2441.2 m2 (taking into account the attic);

Number of floors - 3 + basement + attic;

Room height, m (floor to ceiling):

- basement - 2.60;

- first floor - 3.05;

- second floor - 3.05;

- third floor - 3.05.

The area allocated for overhaul is 1,949,3 m2.

Technical and economic indicators of the building * * * * * * * * * * * * * * * * * *.

Total building area:

- according to BTI - 51.5 m2;

- according to the results of the survey - 51.2 m2;

Number of floors - 1;

Room height, m (floor to ceiling):

- first floor - 3.10;

The area allotted for overhaul is 51.2 m2.

3 Main Design Solutions

3.1 External networks

The working design envisages construction of the distribution feeder line of 240V wire broadcasting, performed by BSM1 wire d = 3 mm, from the existing wire broadcasting rack on the roof of the adjacent building.

For the construction of the feeder line, PCII0.8 radio racks are installed on the roof of buildings * * * * * * * * * * and * * * * * * * * *.

The length of the designed feeder line for each case is 15 m.

The introduction of the radio broadcasting network into the designed building is carried out through a radio rack installed on the roof of the building. Typical arrangement of radio rack is presented on sheet 6. The radio strut is fixed on the roof using 4 braces. The architectural design shall provide embedded parts in the roof.

3.2 Wired Radio Subscriber Network

The working design provides for the construction of an in-house subscriber network of wired radio broadcasting with a voltage of 30V.

The radio broadcasting network is carried out by a PVZh 1x1.8 wire.

Subscriber outlets are connected by 2x1,2 PTPG wire.

On the technical floor of the building * * * * * * * * * 2 step-down transformers 240V/30V TAMU25 with a power of 25 W are installed.

On the ground floor, behind the suspended ceiling, * * * * * * * * * * * * * one reduction transformer 240V/30V TAMU10 with a power of 10 W is installed.

Total number of outlets of the city radio broadcasting network:

- for the building * * * * * * * * * * * * * * * - 61 pcs;

- for * * * * * * * * * * * * * * * * - 1 pc.

For structural diagrams of the radio broadcasting network, see sheets 2 and 3.

Restriction and branching boxes are installed on the wall in the corridor behind the suspended ceilings. Cables are laid from the limiting box to the radiorosets without rupture (loop).

The wire of PVZh 1h1.8 is laid:

- in the corridor, in PVC pipe d = 16 mm. The cable route coincides with the cable route of low-current systems.

The 2x1,2 PTPZ wire is laid:

- in rooms and rooms with permanent stay of people in PVC pipe d = 16 mm, in the stroke.

Placement of equipment and laying of cables on floor plans are presented on sheets 8 - 12.

The cables of the radio transmission system shall be laid separately from other low-current cables on different sides of the partition tray, in different compartments of the duct or in different corrugated PVC pipes.

Radio sockets of an outdoor installation of RPV1, are installed at the height of 0.8 m from the level of a floor and at distance no more than 1 m from electric sockets.

Wiring diagrams of connections in a subscriber broadcasting box of POH2 and in a universal box of UK2P are submitted on sheets 5 and 6 respectively.

4 Lightning protection and grounding

According to "The instruction on the structure of lightning protection of buildings, constructions and industrial communications" a radio rack to ground CO15334.21.1222003 by connection of metalwork of a radio rack with the existing lightning protection contour of the building a steel wire of d=8mm. The current leads are rigidly fixed so as to exclude any break or loosening of the conductors under the influence of electrodynamic forces or accidental mechanical influences (for example, from a gust of wind or a fall of a snow bed). Minimize the number of conductor connections. Connect the elements using electrical welding.

Provide for the following electrical safety measures:

- connect all metal structures to the main conductor of the existing potential equalization system with a 6 mm2 PV3 wire;

- connect the electrical equipment enclosures to the protective zero conductor. Third cable cores for single phase network shall be used for grounding.

5 Safety and Health

Installation and repair works in electrical networks and devices (or near them), as well as work on connection and disconnection of wires should be carried out only when the voltage is removed.

The cables shall be laid and installed in accordance with the requirements of PUE, SNiP 3.05.0685, OSTN-600-93, VSN 11687.

Placement of the designed equipment is made taking into account the current rules on health and safety.

The working design was carried out in accordance with the norms and regulations on safety, environmental and sanitary safety, explosions and fire safety.

The safety of maintenance of designed structures and labor protection are provided by the system of measures provided by the current regulatory and technical documents:

- The State System of Occupational Safety Standards (SSBT):

- Standards of the GOST 12.0.XXX series;

- Standards of the GOST 12.1.XXX series;

- Standards of the GOST 12.2.XXX series;

- Standards of the GOST 12.3.XXX series;

- Standards of the GOST 12.4.XXX series.

- SNiP III480 - "Safety in construction";

- SNiP 12132001 - "Occupational safety in construction. Chast1. General requirements ";

- PPB 0103 - "Fire Safety Rules in the Russian Federation";

- SNiP 210197 - "Fire safety of buildings and structures";

- PUE - "Electrical Installation Rules, ed. 6, 7»;

- "Rules for technical operation of electrical installations of consumers" (utv. by order of the Ministry of Energy of the Russian Federation dated January 13, 2003 No. 6). Information letter instruction No. 01/2003 of 10.03.2003 of the Ministry of Energy of the Russian Federation "About introduction of User Rules for Operating Electrical Equipment";

- PM0162001 SWEAT. RD 15334.0-03.15000 - "Intersectoral rules on labor protection (safety rules) during operation of electrical installations";

- GOST 46479 - "Grounding for fixed wire communication installations, radio relay stations, radio broadcasting units and antennas of television collective reception systems. Resistance Standards ";

- RD 15334.0-03.70299 - "Instruction on first aid in case of industrial accidents."

- PO4500294 SWEAT - "Rules on labor protection at the radio enterprises";

- PO4500595 SWEAT - "Rules on labor protection during the works on cable lines of communication and wire broadcasting (radiofikation)";

- VSN 193 - "Instruction on design of lightning protection of radio objects ";

- VSN 33293 - "Instruction on the design of electrical installations of enterprises and structures of telecommunication, wire broadcasting, radio broadcasting and television";

- VSN 604IV87 - "Safety Rules for Electrical Installation and Commissioning";

- RD 15334.0-03.70299 - "Instruction on first aid in case of industrial accidents."

Drawings content

icon Общие данные_inkognito.dwg

Общие данные_inkognito.dwg

icon Планы_inkognito.dwg

Планы_inkognito.dwg

icon Размещение оборудования на кровле_inkognito.dwg

Размещение оборудования на кровле_inkognito.dwg

icon Схема структурная_inkognito.dwg

Схема структурная_inkognito.dwg

icon Схема функциональная РТ_inkognito.dwg

icon Схемы подключения коробок РТ_Inkognito.dwg

Free downloading for today

Update after: 6 hours 59 minutes
up Up