Project worker for reconstruction of wet gas treatment building for boiler room
- Added: 14.08.2014
- Size: 135 KB
- Downloads: 0
Description
General Instructions
1. For list of main sets per object, refer to 814.1-3-78.0-00-TM.
2. This working project is developed on the basis of tasks of related departments for designing heating and ventilation in accordance with SNiP 2.
Project's Content
|
|
|
814-mzk-dano.doc
|
814-mzk-krat.doc
|
814-mzk-spec.doc
|
814-mzk.dwg
|
Additional information
2.3
General Instructions
For list of main sets per object, refer to 814.1-3-78.0-00-TM.
This working project is developed on the basis of tasks of adjacent departments for designing heating and ventilation in accordance with SNiP 2.04.05-91 *, SNiP II-35-76 .
Outside air design parameters:
cold period of the year: minus 26 ° С;
warm period of the year: + 23.1 ° С.
The average temperature of the heating period is minus 2.7 ° C.
The source of heat supply is this boiler house.
The coolant for the heating system is water with parameters of 110-70 ° C .
The boiler room heating system is designed two-pipe horizontal. Cast iron radiators MS-140-108 GOST 8690-94 are used as heating devices.
Ventilation of the boiler room with natural motive. Air exchange is determined from the condition of assimilation of heat wastes.
Air ducts of BE1-BE3 systems shall be made of galvanized steel GOST 14918-80 class H with thickness according to SNiP 2.04.05-91 *.
2.4
Install heating and ventilation systems, refer to SNiP 3.05.01-85.
Pipelines at the intersection of partitions and internal walls shall be laid in casings made of non-combustible materials.
Structures of insulated shafts, installation of passage units, opening framugs, mechanisms for opening framugs, etc., see 814.1-3-78.0-00-AP.
For the materials submitted for approval, see 814.1-3-78.0-00-501.
814-mzk.dwg
Similar materials
- 16.11.2014
- 11.05.2018
Free downloading for today
- 21.04.2016