• RU
  • icon Waiting For Moderation: 0
Menu

Project Heating and ventilation business center

  • Added: 14.08.2014
  • Size: 6 MB
  • Downloads: 0
Find out how to download this material

Description



The heating system is designed for the estimated winter outside air temperature of -18'С.

Heat supply source - roof boiler room.

The heating and ventilation project was developed on the basis of:

-SNiP II-3-79 * * 'Construction heat engineering', and changes N1 to SNiP II-3-79 * *

Design parameters of coolant in heating system are accepted as Tp = 80 'С

Heating system wiring - double-tube apartment.

Project's Content

icon
icon
icon Отопление_жилой дом.dwg

Additional information

Drawings content

icon Отопление_жилой дом.dwg

Отопление_жилой дом.dwg
up Up